Zero-overhang service road

Place the optical centers on the curb line. The overhang changes the section view, with fixture flux and utilization entered independently.

Road and mounting
ft
ft
ft
×
Luminaire and target
lm
fc
W
Pole pitch
108.45ft
Pitch / height
4.24×
Pole density
48.7poles/mi
Linear power
2.39kW/km

Pole elevation and layout plan

Edit inputs ↓
Pole elevation and layout planCURB SECTIONROADWAY PLANH 25.59 ftSingle-sidedArm 0 ftS 108.45 ftMaintained target0.88 fc
Pitch is measured along one side. A staggered arrangement offsets the opposite row by half the pitch.

RP-8 layout screen

Review needed
OutsideThresholdWithin
  • Same-side pitch / height4.24 / ≤ 4 × outside screen

Comparison uses the entered pitch criterion. Use the relevant RP-8 limits in a point-by-point pavement grid.

Additional readings
Luminaires per repeat1
Combined light loss factor0.765
Maintained delivered flux per repeat2,574.99lm
Area-normalized connected power0.027W/ft²
Optical overhang0ft
Distance to next pole station108.45ft
Pitch limit from height criterion102.36ft

Worked calculation

US customary results for the original preset.

  1. Apply utilization and loss factors over 1 pole per repeat to get 2574.99 lm maintained.
  2. Divide by the road width and target illuminance to get 108.45 ft same-side pitch. The pitch-to-height ratio is 4.24.
  3. Scale the repeat to 48.7 poles/mi and 2.39 kW/km of linear connected power.

Calculation method

Select a maintained illuminance target for the road or parking class. Apply the street-side utilization and light loss to the flux in one repeating roadway cell.

Maintained lumens through one cell
Φcell = Φ × CU × LLD × LDD × fixtures per repeat
Same-side pole pitch
S = Φcell/(Eavg × roadway width)
Pole density and power
Poles/km = 1000 × fixtures per repeat/S · kW/km = poles/km × W/1000

The supplied spacing / height limit is a project heuristic. Verify RP-8 pavement uniformity, glare, luminance, and classification using grid photometry.