Shrink-fit heating allowance

A shop adds 0.04 mm of handling clearance above the diametral interference before assembly.

Input units
Fit pressure 68.005 MPa
Hub hoop 130.54 MPa
Press force 98,703 N
Slip torque 2,714.3 N·m

Anatomy

Interface section and Lamé stress field

Edit inputs
Interface section and Lamé stress fieldSchematic view with the current loads and dimensions. FIT SECTIONHUB STRESSBlue = fit interfaceHoopRadialBore to hub ODPressure p68 MPaBore hoop σθ130.5 MPaBore radial σr-68 MPa

Screening margins

Within screen
  • Hub bore yielding174.8 MPa / 350 MPa
    Within screen

Calculated values

Interface pressure p68.005 MPa
Peak hub hoop stress130.54 MPa
Axial press force at full length98,703 N
Static slip torque capacity2,714.3 N·m
Hub radial stress at bore-68.005 MPa
Hub hoop stress at OD62.536 MPa
Hub bore von Mises stress174.77 MPa
Hub yield factor2.0027 ×
Hub heating ΔT above shaft141.76 °C

Starting result

The reported ΔT is a temperature rise relative to the shaft. Larger assembly clearance requires more heating.

Hub heating ΔT above shaft
141.76 °C
Interface pressure p
68.005 MPa
Static slip torque capacity
2,714.3 N·m

Model and assumptions

p = (δ/d)/[(H+νh)/Eh+(S−νs)/Es] · F = πdLμp · T = Fd/2

Long concentric members with open ends and uniform pressure. Yield is checked at the hub bore under plane stress. Assembly heating assumes a shaft held at its initial temperature and a constant hub expansion coefficient.

References and calculation method

Worked examples

Open the standard calculator