Convert linear thrust into screw torque
Lead is the travel per revolution. Pitch is the axial spacing between threads, so a screw with multiple starts advances farther than one pitch per turn. A TR8×8 commonly has a 2 mm pitch and four starts.
The shaft calculation separates ideal load torque, efficiency losses and added drag. Root diameters and efficiencies in the presets are planning values. Use the actual nut and screw data for preload, permitted RPM and axial ratings.
The stability checks model a uniform steel shaft with ideal supports and a clear span. Euler load applies to compression. The practical speed screen takes 80% of the first shaft critical speed or the entered catalog speed, whichever is lower.
Worked example
At 500 N, a 5 mm lead and 90% efficiency require about 0.442 N·m to move the load. Add 0.05 N·m of drag for a total of roughly 0.492 N·m, or 69.7 oz·in.
Formulas
Lead = thread pitch × startsDriving torque = thrust × lead / (2π η) + extra dragRoot-section moment I = π d⁴ / 64Critical compressive load = π² E I / (K L)²First critical RPM = 60 β² √(E I / (ρ A L⁴)) / (2π)Screened compression limit = critical load / safety factor