Two-Shift Metric Compressor Package

Evaluate a 55 kW air compressor and compare the upgraded annual electricity cost in GBP.

Inputs

View results ↓
Compressor and pressure
NL/min
kW
%
bar(g)
bar
Annual load profile

Enter two time shares. The third load level fills the rest of the operating year.

%
%
%
%
%
h/yr
Electricity and investment
GBP/kWh
GBP

Results

Edit inputs ↑
Part-load compressor power curves SPEC. POWER 6.322 kW/(Nm³/min)BASE ENERGY 2.0e5 kWh/yrSAVINGS 6,129 GBP/yrPAYBACK 2.643 yr POWER / FULL LOAD 0% 100% LOAD MODULATE LOAD/UNLOAD VFD PROFILE MEAN LOAD 62.43 % 0% 25% VFD KNEE 100%
Part-load compressor power curves
Full-load specific power
6.3218 kW/(Nm³/min)
Existing annual electricity
198,620 kWh/yr
Combined annual savings
6,129.2 GBP/yr
Simple payback
2.6431 yr
Full-load package power
55 kW
Equivalent shaft power
70.068 hp
Weighted mean load
62.43 %
Time at load level 3
19 %
Inlet modulation annual energy
239,120 kWh/yr
Load/unload annual energy
198,620 kWh/yr
VFD annual energy at existing pressure
180,280 kWh/yr
VFD annual energy at lower pressure
173,090 kWh/yr
Existing annual electricity cost
47,670 GBP/yr
Upgraded annual electricity cost
41,541 GBP/yr
Savings from VFD only
4,403.5 GBP/yr
Additional pressure savings
1,725.7 GBP/yr
Power reduction at new pressure
3.9885 %

Formula and assumptions

Set the full-load basis

Package kW ≈ shaft hp × 0.7457 ÷ motor efficiency · specific power = package kW/rated flow

A measured full-load package draw is preferred. The motor-mode estimate treats the entered shaft rating as full-load shaft power and omits separate auxiliary loads. Match flow reference, pressure, and package boundaries when comparing ISO 1217 or CAGI performance sheets.

Weight the part-load curves

Annual kWh = full-load kW × hours × Σ(time share × power ratio)

At fractional load L the planning curves are 0.70 + 0.30L for inlet modulation, 0.30 + 0.70L for load/unload, and 0.12 + 0.88L for VFD at or above 25% load. Below 25% the VFD model averages minimum-speed operation with 6% standby draw. Use actual package curves for a purchase decision.

Estimate pressure savings and payback

Pressure factor = 1 − 0.005 × reduction in psi · payback = installed cost/annual savings

The DOE rule of thumb is about 1% of full-output power per 2 psi near 100 psig. The model applies the same factor to the VFD scenario, with rated flow held constant. It excludes demand charges, service costs, and air demand changes after lowering pressure.

Flow labels use dry gas at 101.325 kPa, with 60 °F for SCFM and 0 °C for normal metric flow. See all unit conventions.

Worked examples