Raise Free Chlorine From 1 to 5 ppm in a 15,000-Gallon Pool
The example uses a 10% sodium hypochlorite label and typical density. Use the expected 4 ppm rise as a check after mixing. Sunlight or active demand can lower the next reading.
(5 ppm selected − 1 ppm current), with a floor of zero, gives a 4 ppm rise.
56,781 L × 4 mg/L ÷ 1,000 = 227.12 g chlorine equivalent.
227.12 g ÷ 9.52% chlorine equivalent ÷ 1.16 g/mL = 2,055.61 mL (69.51 fl oz).
With 40 ppm CYA in 15,000 US gal, the starting FC/CYA ratio is 2.5%.
The ratio bands are residential outdoor planning benchmarks. Treatment limits, sanitizer labels and local rules govern actual additions. Keep swimmers out during elevated-chlorine treatment and retest before reopening.
Liquid strengths use label weight percent sodium hypochlorite and a typical product density. Use plain pool-labeled chlorine. Verify the product concentration and free chlorine with a DPD or FAS-DPD test.
Common questions
Why does a 1 to 5 ppm adjustment use a 4 ppm increase?
Start with the measured 1 ppm. The added amount makes up the gap to the chosen target of 5 ppm.
Are fluid ounces here the same as ounces on a kitchen scale?
Use a liquid volume measure. Fluid ounces measure volume and scale ounces measure mass. The product density connects the two.
(5 ppm selected − 1 ppm current), with a floor of zero, gives a 4 ppm rise.
56,781 L × 4 mg/L ÷ 1,000 = 227.12 g chlorine equivalent.
227.12 g ÷ 9.52% chlorine equivalent ÷ 1.16 g/mL = 2,055.61 mL (69.51 fl oz).
With 40 ppm CYA in 15,000 US gal, the starting FC/CYA ratio is 2.5%.
Read the product label, wear the required protection and keep swimmers out during treatment. Never mix pool chemicals or chlorine types, and never add acid and chlorine together. Verify readings with a pool or spa test kit before adding chemicals and retest after circulation and before use.