Required reactive power
Q_C = P · [tan(acos(PF₁)) − tan(acos(PF₂))]
Active kW stays constant. Use lagging power factors with the target at least as high as the original. Upstream apparent power falls from P/PF₁ to P/PF₂.
A 480 V plant wants to raise its 250 kW load from 0.72 to 0.95 lagging PF using a Delta capacitor bank.
Use 250·[tan(acos(0.72)) − tan(acos(0.95))] for the bank. Each Delta capacitor sees 480 V. Divide the 7,200 USD installed cost by the 850 USD/month reduction.
Values in this solution use the original example inputs.
Q_C = P · [tan(acos(PF₁)) − tan(acos(PF₂))]
Active kW stays constant. Use lagging power factors with the target at least as high as the original. Upstream apparent power falls from P/PF₁ to P/PF₂.
C_phase = Q_C · 10⁹ / (3 · 2πf · V_C²) [µF]
Use V_C = V_LL for Delta and V_LL/√3 for Wye. Wye requires three times the capacitance per phase at equal kVAR, line voltage, and frequency.
h₀ ≈ √(1000 · MVA_sc / Q_C); f₀ = f · h₀
Screen an undetuned bank on a predominantly inductive source. An alert within 0.5 of an odd order from 3 to 13 flags a case for spectrum and switching-step review. Check other orders and actual bus configurations.
I = 1000 · S / (√3 · V_LL), payback = installed cost / monthly penalty reduction
Enter the tariff penalty for each condition. A positive reduction with a nonzero bank is required for a simple payback. The currency selector changes units only.
Balanced sinusoidal load. Compare manufacturer voltage, step size, inrush and switching duties. Review harmonics, resonance, and light-load overcompensation before choosing a bank.