Load already at the target PF

A 125 kW compressor group is already at its 0.95 target.

Inputs

Load & bank
Enter the three-phase short-circuit MVA at the bank. Use 0 to omit resonance screening.
Utility penalty

Reactive compensation and capacity

60 Hz · US customaryEdit inputs
Reactive compensation and capacity at 60 Hz BANK SIZE0kVARPER PHASE0µFFREED KVA0kVAPAYBACK—Before and after correctionCorrectedOriginalTransformer capacityBefore correction131.58 kVAAfter correction131.58 kVAReleased capacity0 kVACurrent reduction0%of original
  • Simple payback requires a positive monthly penalty reduction.

Detailed results
Reactive compensation
0 kVAR
Capacitance per phase
0 µF
Voltage across each capacitor
480 V
Line current reduction
0%
Transformer capacity freed
0 kVA
Apparent power before
131.58 kVA
Apparent power after
131.58 kVA
Reactive power before
41.09 kVAR
Reactive power after
41.09 kVAR
Line current before
158.26 A
Line current after
158.26 A
Monthly penalty reduction
0 USD/mo
Simple payback
Unavailable
Estimated parallel resonance order
Unavailable
Estimated parallel resonance frequency
Unavailable

Worked calculation

The two tangent terms are equal. Bank kVAR and capacitance are zero, and the before/after current is identical.

Reactive compensation
0 kVAR
Capacitance per phase
0 µF
Line current reduction
0%

Values in this solution use the original example inputs.

Formulas & assumptions

Required reactive power

Q_C = P · [tan(acos(PF₁)) − tan(acos(PF₂))]

Active kW stays constant. Use lagging power factors with the target at least as high as the original. Upstream apparent power falls from P/PF₁ to P/PF₂.

Three equal capacitors

C_phase = Q_C · 10⁹ / (3 · 2πf · V_C²) [µF]

Use V_C = V_LL for Delta and V_LL/√3 for Wye. Wye requires three times the capacitance per phase at equal kVAR, line voltage, and frequency.

Parallel resonance

h₀ ≈ √(1000 · MVA_sc / Q_C); f₀ = f · h₀

Screen an undetuned bank on a predominantly inductive source. An alert within 0.5 of an odd order from 3 to 13 flags a case for spectrum and switching-step review. Check other orders and actual bus configurations.

Current and payback

I = 1000 · S / (√3 · V_LL), payback = installed cost / monthly penalty reduction

Enter the tariff penalty for each condition. A positive reduction with a nonzero bank is required for a simple payback. The currency selector changes units only.