Unity PF as a comparison point

A test scenario compares an 0.88 lagging 300 kW load against a mathematical target of 1.00.

Inputs

Load & bank
Enter the three-phase short-circuit MVA at the bank. Use 0 to omit resonance screening.
Utility penalty

Reactive compensation and capacity

60 Hz · US customaryEdit inputs
Reactive compensation and capacity at 60 Hz BANK SIZE161.92kVARPER PHASE621.4µFFREED KVA40.91kVAPAYBACK15.28moBefore and after correctionCorrectedOriginalTransformer capacityBefore correction340.91 kVAAfter correction300 kVAReleased capacity40.91 kVACurrent reduction12%of original

Detailed results
Reactive compensation
161.92 kVAR
Capacitance per phase
621.4 µF
Voltage across each capacitor
480 V
Line current reduction
12%
Transformer capacity freed
40.91 kVA
Apparent power before
340.91 kVA
Apparent power after
300 kVA
Reactive power before
161.92 kVAR
Reactive power after
0 kVAR
Line current before
410.05 A
Line current after
360.84 A
Monthly penalty reduction
720 USD/mo
Simple payback
15.28 mo
Estimated parallel resonance order
Unavailable
Estimated parallel resonance frequency
Unavailable

Worked calculation

At unity PF, tan(acos(1)) is zero. Compensation equals all original reactive power, and the corrected apparent power equals 300 kVA.

Reactive compensation
161.92 kVAR
Apparent power after
300 kVA
Reactive power after
0 kVAR

Values in this solution use the original example inputs.

Formulas & assumptions

Required reactive power

Q_C = P · [tan(acos(PF₁)) − tan(acos(PF₂))]

Active kW stays constant. Use lagging power factors with the target at least as high as the original. Upstream apparent power falls from P/PF₁ to P/PF₂.

Three equal capacitors

C_phase = Q_C · 10⁹ / (3 · 2πf · V_C²) [µF]

Use V_C = V_LL for Delta and V_LL/√3 for Wye. Wye requires three times the capacitance per phase at equal kVAR, line voltage, and frequency.

Parallel resonance

h₀ ≈ √(1000 · MVA_sc / Q_C); f₀ = f · h₀

Screen an undetuned bank on a predominantly inductive source. An alert within 0.5 of an odd order from 3 to 13 flags a case for spectrum and switching-step review. Check other orders and actual bus configurations.

Current and payback

I = 1000 · S / (√3 · V_LL), payback = installed cost / monthly penalty reduction

Enter the tariff penalty for each condition. A positive reduction with a nonzero bank is required for a simple payback. The currency selector changes units only.

Balanced sinusoidal load. Compare manufacturer voltage, step size, inrush and switching duties. Review harmonics, resonance, and light-load overcompensation before choosing a bank.