A remote feeder supplies 1,500 kVA through 6% impedance. The utility reports 32 MVA available at the primary.

Inputs

Nameplate & source
Use 0 for infinite bus. Enter utility fault MVA at the transformer primary.
Enter the nameplate or test ratio for peak fault estimates. Use 0 if unknown.
Use 0 to assume the utility impedance has the same angle as the transformer.
Losses & loading
Use 0 to omit minimum kVA sizing.

Transformer efficiency and fault duty

60 Hz · US customaryEdit inputs
Transformer efficiency and fault duty at 60 Hz SECONDARY FLA1.804KABOLTED FAULT30.07kAEFFICIENCY99.079%MINIMUM KVA1.333KkVAEfficiency vs. loading100% efficiency96%6.3% load100% loadSecondary fault duty13.8 kV480 VInfinite bus30.07 kAFinite bus16.88 kANameplate loading85% load100% rated

Detailed results
Primary full-load current
62.76 A
Secondary full-load current
1,804.22 A
Infinite-bus symmetrical fault
30.07 kA
Finite-bus symmetrical fault
16.88 kA
Infinite-bus L–L fault on three-phase supply
26.04 kA
Finite-bus L–L fault on three-phase supply
14.62 kA
Infinite-bus asymmetrical peak
Unavailable
Finite-bus asymmetrical peak
Unavailable
Operating efficiency
99.079%
Mathematical peak efficiency load
38.94%
Peak efficiency through rated load
99.301%
Operating output power
1,147.5 kW
Operating load loss
8,814.5 W
Operating total loss
10,664.5 W
Minimum design capacity
1,333.33 kVA
Nameplate above minimum
166.67 kVA

Worked calculation

Convert 32 MVA to 32,000 kVA. Add 1,500/32,000 pu to 0.06. The added source impedance cuts the symmetrical current relative to an infinite bus.

Infinite-bus symmetrical fault
30.07 kA
Finite-bus symmetrical fault
16.88 kA
Minimum design capacity
1,333.33 kVA

Values in this solution use the original example inputs.

Formulas & assumptions

Rated current and capacity

I_FLA = 1000 · kVA / (g · V), kVA_min = design kW / (PF · target load fraction)

Use g = √3 and line-to-line voltage for three-phase, or g = 1 and applied winding voltage for single-phase. Select a nameplate rating and check the reserve.

Terminal bolted fault

I_sc = I_FLA / |Z_tx + Z_src|; Z_src,pu = rated kVA / utility fault kVA

The infinite-bus case sets Z_src to zero. Enter X/R to add resistance and reactance on the same base. Without X/R, the impedance magnitudes are added assuming equal angles. For a three-phase supply with equal positive and negative sequence impedance, the L–L fault is √3/2 times the three-phase fault.

Asymmetrical peak screen

i_peak ≈ √2 · I_sc · [1.02 + 0.98 · exp(−3R/X)]

Uses the combined radial terminal impedance and nominal prefault voltage. Peak values refer to the symmetrical fault results above. They omit standard voltage and equipment correction factors and are for screening.

Losses and efficiency

η = P_out / (P_out + P₀ + x² · P_cu), x_peak = √(P₀ / P_cu)

x is load fraction relative to nameplate kVA and P_out = x · rated kVA · PF. Use consistent watts. Peak efficiency occurs when modeled load loss equals core loss.

Nominal RMS voltages, symmetric bolted fault at secondary terminals, and losses at a fixed reference temperature. Check source X/R, service voltage, impedance tolerance, downstream impedance, and contributions from motors and generators in a fault study.

Engineering references

More worked examples