Worked example · Agency finance lead
Boutique agency rate with allocated overhead
A design agency allocates £24,000 of overhead to a senior designer earning £82,000 loaded compensation. Finance wants the rate at 60% utilization after launch-season holidays.
Model results
- Target hourly rate
- £149.56/hr
- Covers costs and target margin
- Break-even cost per hour
- £112.17/hr
- Annual billable hours
- 945 hr
- Monthly retainer at capacity
- £11,777.78
- Across the modeled billable hours
All model outputs
- Available hours after time off
- 1,575 hr
- Average monthly billable hours
- 78.75 hr
- Total annual costs
- £106,000
Charts and data
Annual time allocation
Time remaining after holidays and PTO is split by utilization.
- Billable945 hr
- Non-billable630 hr
- Time off105 hr
Hourly rate build-up
Loaded labor plus overhead and profit per billable hour.
Capacity and required revenue
| Item | Value | Unit |
|---|---|---|
| Scheduled hours | 1,680 | hrs |
| PTO and holidays | 105 | hrs |
| Non-billable time | 630 | hrs |
| Billable time | 945 | hrs |
| Loaded compensation | £82,000 | GBP |
| Annual overhead | £24,000 | GBP |
| Required annual revenue at target margin | £141,333.33 | GBP |
How the model works
Start with capacity you can sell
Scheduled weeks times weekly hours gives gross capacity. Subtract PTO and holidays using a five-day work week. Multiply the remainder by utilization to get billable time.
Turn annual costs into a rate
Loaded compensation plus overhead divided by billable hours gives break-even hourly cost. Divide again by one minus the target margin for the target rate. The monthly retainer funds one-twelfth of the modeled billable capacity.
Frequently asked questions
Which costs belong in a design agency’s allocated overhead?
Include nonpayroll costs allocated to the capacity you are modeling, such as software, rent and shared services. Keep costs already included in loaded compensation out of overhead.
Why is break-even higher than the designer’s loaded hourly wage?
The rate must recover overhead and fund the time that cannot be billed. Total loaded cost gets divided by sellable hours.