Worked example · Consulting delivery lead

Monthly retainer for a delivery consultant’s capacity

A consultant in a European implementation firm works 37.5 scheduled hours a week with 30 days off. The delivery lead wants a monthly retainer that pays for the consultant’s projected annual capacity.

Model results

Target hourly rate
€113.96/hr
Covers costs and target margin
Break-even cost per hour
€88.89/hr
Annual billable hours
1,293.75 hr
Monthly retainer at capacity
€12,286.32
Across the modeled billable hours
All model outputs
Available hours after time off
1,725 hr
Average monthly billable hours
107.81 hr
Total annual costs
€115,000

Inputs

Currency sets the unit for every amount. Switching currency keeps the same figures. Input period changes the display of recurring amounts.

Compensation and overhead
EUR

Include employer costs or the full compensation you want to cover.

EUR
%
Annual working capacity

Enter weeks before subtracting PTO and holidays.

%

Charts and data

Annual time allocation

Time remaining after holidays and PTO is split by utilization.

Annual scheduled time allocationScheduled timeBillable 1.3K hrNon-billable 431.3 hrTime off 225 hr
  • Billable1.3K hr
  • Non-billable431.3 hr
  • Time off225 hr

Hourly rate build-up

Loaded labor plus overhead and profit per billable hour.

Hourly rate build-up in EUR€0/hr€28.49/hr€56.98/hr€85.47/hr€113.96/hrLabor €75.75/hrLaborOverhead €13.14/hrOverheadProfit €25.07/hrProfitTarget €113.96/hrTarget
Capacity and required revenue
Capacity and required revenue
ItemValueUnit
Scheduled hours1,950hrs
PTO and holidays225hrs
Non-billable time431.25hrs
Billable time1,293.75hrs
Loaded compensation€98,000EUR
Annual overhead€17,000EUR
Required annual revenue at target margin€147,435.9EUR

How the model works

Start with capacity you can sell

Scheduled weeks times weekly hours gives gross capacity. Subtract PTO and holidays using a five-day work week. Multiply the remainder by utilization to get billable time.

Turn annual costs into a rate

Loaded compensation plus overhead divided by billable hours gives break-even hourly cost. Divide again by one minus the target margin for the target rate. The monthly retainer funds one-twelfth of the modeled billable capacity.

Frequently asked questions

How do I convert this delivery consultant’s annual capacity into a retainer?

Divide annual billable hours by 12 and multiply by the target hourly rate. The retainer covers average sellable capacity across the year.

Can a steady retainer coexist with months that have fewer consulting hours?

Yes. The calculation averages annual capacity. Use your contract terms to decide how variable hours, overages and unused capacity are handled.