Worked example · Studio operations lead

Hourly rate for a seasonal agency schedule

A creative studio takes a six-week seasonal shutdown before individual time off. The operations lead prices its 32-hour regular schedule using the remaining 46 weeks and projected 72% billable utilization.

Model results

Target hourly rate
$145.1/hr
Covers costs and target margin
Break-even cost per hour
$105.92/hr
Annual billable hours
967.68 hr
Monthly retainer at capacity
$11,700.91
Across the modeled billable hours
All model outputs
Available hours after time off
1,344 hr
Average monthly billable hours
80.64 hr
Total annual costs
$102,500

Inputs

Currency sets the unit for every amount. Switching currency keeps the same figures. Input period changes the display of recurring amounts.

Compensation and overhead
USD

Include employer costs or the full compensation you want to cover.

USD
%
Annual working capacity

Enter weeks before subtracting PTO and holidays.

%

Charts and data

Annual time allocation

Time remaining after holidays and PTO is split by utilization.

Annual scheduled time allocationScheduled timeBillable 967.7 hrNon-billable 376.3 hrTime off 128 hr
  • Billable967.7 hr
  • Non-billable376.3 hr
  • Time off128 hr

Hourly rate build-up

Loaded labor plus overhead and profit per billable hour.

Hourly rate build-up in USD$0/hr$36.28/hr$72.55/hr$108.83/hr$145.1/hrLabor $89.91/hrLaborOverhead $16.02/hrOverheadProfit $39.18/hrProfitTarget $145.1/hrTarget
Capacity and required revenue
Capacity and required revenue
ItemValueUnit
Scheduled hours1,472hrs
PTO and holidays128hrs
Non-billable time376.32hrs
Billable time967.68hrs
Loaded compensation$87,000USD
Annual overhead$15,500USD
Required annual revenue at target margin$140,410.96USD

How the model works

Start with capacity you can sell

Scheduled weeks times weekly hours gives gross capacity. Subtract PTO and holidays using a five-day work week. Multiply the remainder by utilization to get billable time.

Turn annual costs into a rate

Loaded compensation plus overhead divided by billable hours gives break-even hourly cost. Divide again by one minus the target margin for the target rate. The monthly retainer funds one-twelfth of the modeled billable capacity.

Frequently asked questions

Where do seasonal shutdown weeks go in the agency capacity worksheet?

Reduce scheduled work weeks for the studio closure. Enter individual holidays and PTO only if they occur during the scheduled work weeks.

Does the price assume all design projects have the same delivery cost?

It averages the annual costs you enter across sellable capacity. A project with unusual staffing or vendor costs needs its own estimate.