Worked example · ASCE/SEI 7-16 §§13.3.1, 13.4 and Chapter 2

Grade-supported pump on the minimum Fₚ

A low rigid pump at grade has a large response factor. The minimum component force governs even with the height multiplier at unity.

Calculation sheet
Export

Inputs

Component and attachment
g
ft
ft
Anchor group geometry
kip
ft
ft
Anchorage overstrength
Anchorage demand

Use 1 unless the attachment provision requires a higher factor.

LATERAL Fₚ
0.71kip
VERTICAL |Eᵥ|
0.474kip
LRFD UPLIFT
0kip
ASD UPLIFT
0kip

Attachment in elevationComponent attachmentz/h 0h 45 ftSkid free-body diagramAnchor row spacing↑ |Eᵥ| 0.47 kipFₚ 0.71 kipCG 1.5 ftUplift 0 kip
The elevation locates the component relative to the roof. The free-body sketch shows the horizontal force and vertical load path.

Calculation detail

Height ratio z/h
0
Unbounded Fₚ
0.158 kip
Minimum Fₚ
0.71 kip
Maximum Fₚ
3.789 kip
Governing Fₚ
Lower bound
Unfactored overturning
1.066 kip·ft
LRFD gravity stability factor
3.387
LRFD support contact
In compression
ASD gravity stability factor
3.194
ASD support contact
In compression
Demand on the two anchor rows
Load combinationNet gravity (kip)Uplift row (kip)Opposite row (kip)Shear / row (kip)
LRFD uplift2.4064000.3552
ASD uplift1.5885000.2486

How the calculation works

Read this example

Check the lower-bound row before carrying the force into a separate anchorage capacity calculation.

Preset result: LATERAL Fₚ 0.71 kip.

Calculate the horizontal force

Eq. 13.3-1 uses 0.4aₚSᴅₛWₚ(Iₚ/Rₚ)(1 + 2z/h). The result is bounded by 0.3SᴅₛIₚWₚ and 1.6SᴅₛIₚWₚ. The attachment-height ratio is at most 1.

Combine overturning and upward vertical action

The worksheet takes |Eᵥ| = 0.2SᴅₛWₚ. The simplified LRFD uplift case is 0.9D − Eᵥ + Eₕ. The ASD case is 0.6D − 0.7Eᵥ + 0.7Eₕ. A selectable horizontal multiplier is applied to the anchorage demand.

Resolve the anchor rows

For a centered component and rigid base, each row takes half the horizontal shear. The tension-side reaction is M divided by row spacing minus half the effective gravity. The gravity stability factor divides the stabilizing gravity moment by the overturning moment. A factor of 1 places the uplift row at the contact limit.

Design scope

Demand screening for a centered equipment skid on two symmetric anchor rows. Verify component classifications, governing combinations, attachment overstrength, capacities, interaction, eccentricity and prying separately.

Source references
  • ASCE/SEI 7-16 standardhttps://ascelibrary.org/doi/book/10.1061/9780784414248
  • FEMA P-1051 design exampleshttps://www.fema.gov/sites/default/files/2020-07/fema_nehrp-seismic-provisions-examples_p-1051_20160701.pdf

More component force & anchors examples