Worked example · ASCE/SEI 7-16 §§13.3.1, 13.4 and Chapter 2

Emergency generator with anchor overstrength

A generator assigned important service uses a component force check and an explicitly selected horizontal anchor multiplier for the illustrative attachment.

Calculation sheet
Export

Inputs

Component and attachment
g
ft
ft
Anchor group geometry
kip
ft
ft
Anchorage overstrength
Anchorage demand

Use 1 unless the attachment provision requires a higher factor.

LATERAL Fₚ
13.855kip
VERTICAL |Eᵥ|
3.016kip
LRFD UPLIFT
19.83kip
ASD UPLIFT
14.076kip

Attachment in elevationComponent attachmentz/h 0.266h 64 ftSkid free-body diagramAnchor row spacing↑ |Eᵥ| 3.02 kipFₚ 13.85 kipCG 4.1 ftUplift 19.83 kip
The elevation locates the component relative to the roof. The free-body sketch shows the horizontal force and vertical load path.

Calculation detail

Height ratio z/h
0.266
Unbounded Fₚ
13.855 kip
Minimum Fₚ
6.786 kip
Maximum Fₚ
36.192 kip
Governing Fₚ
Calculated Fₚ
Unfactored overturning
56.804 kip·ft
LRFD gravity stability factor
0.18
LRFD support contact
Uplift
ASD gravity stability factor
0.168
ASD support contact
Uplift
Demand on the two anchor rows
Load combinationNet gravity (kip)Uplift row (kip)Opposite row (kip)Shear / row (kip)
LRFD uplift8.68419.8301013.8547
ASD uplift5.688814.076109.6983

How the calculation works

Read this example

The multiplier affects the anchor row demands. Confirm its required value for the actual anchor and attachment category.

Preset result: LATERAL Fₚ 13.855 kip.

Calculate the horizontal force

Eq. 13.3-1 uses 0.4aₚSᴅₛWₚ(Iₚ/Rₚ)(1 + 2z/h). The result is bounded by 0.3SᴅₛIₚWₚ and 1.6SᴅₛIₚWₚ. The attachment-height ratio is at most 1.

Combine overturning and upward vertical action

The worksheet takes |Eᵥ| = 0.2SᴅₛWₚ. The simplified LRFD uplift case is 0.9D − Eᵥ + Eₕ. The ASD case is 0.6D − 0.7Eᵥ + 0.7Eₕ. A selectable horizontal multiplier is applied to the anchorage demand.

Resolve the anchor rows

For a centered component and rigid base, each row takes half the horizontal shear. The tension-side reaction is M divided by row spacing minus half the effective gravity. The gravity stability factor divides the stabilizing gravity moment by the overturning moment. A factor of 1 places the uplift row at the contact limit.

Design scope

Demand screening for a centered equipment skid on two symmetric anchor rows. Verify component classifications, governing combinations, attachment overstrength, capacities, interaction, eccentricity and prying separately.

Source references
  • ASCE/SEI 7-16 standardhttps://ascelibrary.org/doi/book/10.1061/9780784414248
  • FEMA P-1051 design exampleshttps://www.fema.gov/sites/default/files/2020-07/fema_nehrp-seismic-provisions-examples_p-1051_20160701.pdf

More component force & anchors examples