Worked example · ASCE/SEI 7-16 §§13.3.1, 13.4 and Chapter 2

Tall control cabinet at mid-height

A narrow equipment base and high center of gravity create substantial positive tension in one anchor row at a mid-building elevation.

Calculation sheet
Export

Inputs

Component and attachment
g
ft
ft
Anchor group geometry
kip
ft
ft
Anchorage overstrength
Anchorage demand

Use 1 unless the attachment provision requires a higher factor.

LATERAL Fₚ
1.096kip
VERTICAL |Eᵥ|
0.403kip
LRFD UPLIFT
2.545kip
ASD UPLIFT
1.813kip

Attachment in elevationComponent attachmentz/h 0.406h 64 ftSkid free-body diagramAnchor row spacing↑ |Eᵥ| 0.4 kipFₚ 1.1 kipCG 4.8 ftUplift 2.55 kip
The elevation locates the component relative to the roof. The free-body sketch shows the horizontal force and vertical load path.

Calculation detail

Height ratio z/h
0.406
Unbounded Fₚ
1.096 kip
Minimum Fₚ
0.907 kip
Maximum Fₚ
4.838 kip
Governing Fₚ
Calculated Fₚ
Unfactored overturning
5.262 kip·ft
LRFD gravity stability factor
0.226
LRFD support contact
Uplift
ASD gravity stability factor
0.212
ASD support contact
Uplift
Demand on the two anchor rows
Load combinationNet gravity (kip)Uplift row (kip)Opposite row (kip)Shear / row (kip)
LRFD uplift1.48682.545200.5481
ASD uplift0.97781.813100.3837

How the calculation works

Read this example

The demand table distinguishes the uplift row and opposite row and shows the shear shared by each.

Preset result: LATERAL Fₚ 1.096 kip.

Calculate the horizontal force

Eq. 13.3-1 uses 0.4aₚSᴅₛWₚ(Iₚ/Rₚ)(1 + 2z/h). The result is bounded by 0.3SᴅₛIₚWₚ and 1.6SᴅₛIₚWₚ. The attachment-height ratio is at most 1.

Combine overturning and upward vertical action

The worksheet takes |Eᵥ| = 0.2SᴅₛWₚ. The simplified LRFD uplift case is 0.9D − Eᵥ + Eₕ. The ASD case is 0.6D − 0.7Eᵥ + 0.7Eₕ. A selectable horizontal multiplier is applied to the anchorage demand.

Resolve the anchor rows

For a centered component and rigid base, each row takes half the horizontal shear. The tension-side reaction is M divided by row spacing minus half the effective gravity. The gravity stability factor divides the stabilizing gravity moment by the overturning moment. A factor of 1 places the uplift row at the contact limit.

Design scope

Demand screening for a centered equipment skid on two symmetric anchor rows. Verify component classifications, governing combinations, attachment overstrength, capacities, interaction, eccentricity and prying separately.

Source references
  • ASCE/SEI 7-16 standardhttps://ascelibrary.org/doi/book/10.1061/9780784414248
  • FEMA P-1051 design exampleshttps://www.fema.gov/sites/default/files/2020-07/fema_nehrp-seismic-provisions-examples_p-1051_20160701.pdf

More component force & anchors examples