How the calculation works
Read this example
The demand table distinguishes the uplift row and opposite row and shows the shear shared by each.
Preset result: LATERAL Fₚ 1.096 kip.
Calculate the horizontal force
Eq. 13.3-1 uses 0.4aₚSᴅₛWₚ(Iₚ/Rₚ)(1 + 2z/h). The result is bounded by 0.3SᴅₛIₚWₚ and 1.6SᴅₛIₚWₚ. The attachment-height ratio is at most 1.
Combine overturning and upward vertical action
The worksheet takes |Eᵥ| = 0.2SᴅₛWₚ. The simplified LRFD uplift case is 0.9D − Eᵥ + Eₕ. The ASD case is 0.6D − 0.7Eᵥ + 0.7Eₕ. A selectable horizontal multiplier is applied to the anchorage demand.
Resolve the anchor rows
For a centered component and rigid base, each row takes half the horizontal shear. The tension-side reaction is M divided by row spacing minus half the effective gravity. The gravity stability factor divides the stabilizing gravity moment by the overturning moment. A factor of 1 places the uplift row at the contact limit.
Design scope
Demand screening for a centered equipment skid on two symmetric anchor rows. Verify component classifications, governing combinations, attachment overstrength, capacities, interaction, eccentricity and prying separately.
Source references
- ASCE/SEI 7-16 standardhttps://ascelibrary.org/doi/book/10.1061/9780784414248
- FEMA P-1051 design exampleshttps://www.fema.gov/sites/default/files/2020-07/fema_nehrp-seismic-provisions-examples_p-1051_20160701.pdf