A 70 TB warehouse with six-hour backups
An analytics warehouse changes by 0.7% each day. The daily retention tier keeps 30 days of recovery points every six hours, in addition to weekly, monthly, and yearly fulls.
Jump to resultsInputs
Results
Runs in your browser- Stored archive
- 305.763TB
- Worst-chain restore
- 17.052h
- Modeled recovery interval
- 6h
The modeled restore and recovery interval meet the supplied targets. Confirm with an exercise.
| Daily tier | 14.096 TB |
|---|---|
| Weekly tier | 93.333 TB |
| Monthly tier | 140 TB |
| Yearly tier | 58.333 TB |
| Incrementals in worst chain | 119 |
| Retained recovery points | 145 |
| Effective reduction vs all fulls | 33.196 × |
| Worst restore bytes on wire | 42.289 TB |
| Transfer time only | 13.052 h |
What to try
There are 119 incrementals between the oldest full and newest point in the single-chain model. More frequent synthetic fulls may reduce restore work and affect archive size.
How the estimate works
RTO ≈ restore preparation + bytes on wire ÷ usable restore bandwidth
The daily tier starts with one full backup followed by incrementals. Weekly, monthly, and yearly checkpoints are separate full restore points. The model assumes distinct checkpoints, steady changes, and deduplication plus compression across stored data.
The worst daily-chain restore reads a full backup and all retained incrementals. Archive dedup by itself does not reduce the logical bytes a full restore needs. The wire estimate assumes compressed transfer and uses the configured link efficiency plus preparation and replay time.
The modeled recovery point interval uses the daily-tier backup schedule when enabled, or the most frequent retained full tier otherwise. Measure actual backup delays and restore throughput to validate your recovery objectives.
Frequently asked questions
Why are there 119 incrementals for 30 warehouse days?
Six-hour spacing creates 120 retained points across 30 days. The first point is a full and the other 119 are incrementals.
Would one data warehouse backup every six hours meet a six-hour RPO?
The interval consumes the entire allowance. Add actual job completion delays and validation time before claiming the objective is met.