A weekly webhook outage review

A webhook relay missed 12.5 minutes of delivery processing this week. Its on-call team tracks a 99.9% service-time target across seven days.

Jump to results

Inputs

Service objective
%
min
Burn-rate observations

Use the same availability indicator for each interval. Blank observations leave the corresponding alert unassessed.

% errors
% errors
% errors
% errors
% errors

Results

Runs in your browser
Remaining budget
-2.42min
Allowed downtime
10.08min
Time to exhaustion
0min At the recent measured rate

The reporting-window error budget is exhausted.

Budget and burn rates
Budget and burn rates124.008 percent used. -2.42 min remains.Error budget used124.008%10.08 min allowed in this windowShort / long windows relative to alert threshold1 h / 5 min14.4× · Below6 h / 30 min6× · Below3 days / 6 h1× · BelowLong windowShort windowThreshold
Detailed results
Observed uptime99.876 %
Budget used124.008 %
Current burn rate0 ×
Reporting window burn1.24 ×
1 h burn at 14.4× threshold0.2 ×
5 min burn for 1 h / 5 min0 ×
Page for 1 h / 5 minBelow threshold
6 h burn at 6× threshold0.8 ×
30 min burn for 6 h / 30 min0 ×
Page for 6 h / 30 minBelow threshold
3 days burn at 1× threshold2.3 ×
6 h burn for 3 days / 6 h0.8 ×
Ticket for 3 days / 6 hBelow threshold

What to try

The outage overspent the weekly allowance by 2.42 minutes. Try a ten-minute mitigation instead to quantify the improvement, then compare against a separate late-delivery objective.

How the estimate works

Error budget = (1 − SLO) × window size

A time-based budget is the outage allowance over the full reporting window. A request-based budget is the maximum whole number of eligible requests that can fail while meeting the objective.

Burn rate is the observed error rate divided by the allowed error rate. Each alert requires both windows to meet the threshold. The same 14.4×, 6×, and 1× thresholds are offered for all windows. Their budget fractions were originally set for a 30-day SLO.

Time to exhaustion projects the last five minutes of burn, or uses your full-window average when that reading is blank. For request-based objectives it assumes the reporting window’s average request volume continues.

Frequently asked questions

Should delivery lag count as webhook downtime?

It depends on the delivery promise. If the relay accepted events but delivered them late, a separate freshness objective can capture the impact more directly.

Does a healthy webhook relay immediately recover its weekly budget?

No. The overage persists until the failed minutes age out of the rolling window or the accounting period resets.

Open SLA & error budgets calculator