150 psig drum with heat recovery
A 150 psig boiler produces 12,000 lb/hr with 180 ppm in the feedwater. A flash vessel and liquid exchanger recover part of the blowdown heat.
Inputs
Inputs
- Steam load
- 12,000 lb/hr
- Boiler pressure
- 150 psig
- Feedwater test
- TDS (ppm)
- Feedwater TDS
- 180 ppm
- Drum TDS limit source
- ABMA screening
- Steam returned as condensate
- 70 %
- Cold make-up temperature
- 68 °F
- Blowdown heat recovery
- Enabled
- Flash receiver pressure
- 5 psig
- Flash steam utilization
- 90 %
- Liquid heat recovery
- 70 %
- Boiler efficiency
- 82 %
- Annual operating time
- 6,500 h/yr
- Currency
- USD
- Energy price
- 8.5 USD/MMBtu
Calculation results
- Blowdown / steam production
- 5.42%
- Blowdown flow
- 650.6lb/hr
- TDS cycles of concentration
- 19.444×
- Fresh make-up flow
- 4,250.6lb/hr
- Total boiler feedwater
- 12,650.6lb/hr
- Effective feedwater TDS
- 180ppm
- Drum TDS target
- 3,500ppm
- ABMA screening value
- 3,500ppm
- Gross annual blowdown heat
- 1,279MMBtu/yr
- Generated flash steam with recovery
- 97lb/hr
- Usable flash heat
- 83,808.8Btu/h
- Liquid HX heat
- 61,739Btu/h
- Annual heat recovered
- 946.1MMBtu/yr
- Annual unrecovered heat
- 332.9MMBtu/yr
- Annual fuel energy avoided
- 1,153.7MMBtu/yr
- Annual fuel savings
- 9,807USD/yr
Calculation basis
- Steady drum solids
BD/S = F/(B − F); cycles = B/F - Water balance and screening bands
Feed = S + BD; make-up = feed − returned condensate - Flash and heat exchanger
f = (h_f,boiler − h_f,receiver)/h_fg,receiver; Q_BD = BD·(h_f,boiler − h_makeup)
Check the original case
Check that steam production plus blowdown equals the total feed. Toggle recovery to compare annual fuel avoided.
- Blowdown / steam production5.42 %
- TDS cycles of concentration19.444 ×
- Blowdown flow650.6 lb/hr
- Annual fuel savings9,807 USD/yr
Formulas and assumptions
Steady drum solids
BD/S = F/(B − F); cycles = B/F
F is the effective feedwater TDS, B is the drum target and S is dry steam production. Conductivity is multiplied by an editable site factor. Zero feed TDS gives zero calculated continuous blowdown and unlimited theoretical cycles.
Water balance and screening bands
Feed = S + BD; make-up = feed − returned condensate
ABMA screening values are 3,500 ppm through 300 psig, 3,000 ppm above 300 through 450 psig, and 2,500 ppm above 450 through 600 psig. Use the verified OEM or site target when it is more restrictive.
Flash and heat exchanger
f = (h_f,boiler − h_f,receiver)/h_fg,receiver; Q_BD = BD·(h_f,boiler − h_makeup)
Usable vapor yields flash latent heat. The exchanger recovers an entered fraction of the remaining liquid sensible heat relative to make-up. Divide recovered heat by boiler efficiency to estimate fuel avoided.
Worked examples
Open a case to edit its inputs.