500 psig drum with a site TDS limit
The site sets a 1,800 ppm drum target on a 500 psig boiler. Size the continuous discharge for a 110 ppm feed.
Inputs
Inputs
- Steam load
- 21,000 lb/hr
- Boiler pressure
- 500 psig
- Feedwater test
- TDS (ppm)
- Feedwater TDS
- 110 ppm
- Drum TDS limit source
- Enter site limit
- Site drum TDS limit
- 1,800 ppm
- Steam returned as condensate
- 70 %
- Cold make-up temperature
- 68 °F
- Blowdown heat recovery
- Enabled
- Flash receiver pressure
- 20 psig
- Flash steam utilization
- 90 %
- Liquid heat recovery
- 70 %
- Boiler efficiency
- 82 %
- Annual operating time
- 6,500 h/yr
- Currency
- USD
- Energy price
- 8.5 USD/MMBtu
Calculation results
- Blowdown / steam production
- 6.51%
- Blowdown flow
- 1,366.9lb/hr
- TDS cycles of concentration
- 16.364×
- Fresh make-up flow
- 7,666.9lb/hr
- Total boiler feedwater
- 22,366.9lb/hr
- Effective feedwater TDS
- 110ppm
- Drum TDS target
- 1,800ppm
- ABMA screening value
- 2,500ppm
- Gross annual blowdown heat
- 3,703.5MMBtu/yr
- Generated flash steam with recovery
- 328lb/hr
- Usable flash heat
- 277,349.81Btu/h
- Liquid HX heat
- 139,177.61Btu/h
- Annual heat recovered
- 2,707.4MMBtu/yr
- Annual unrecovered heat
- 996.1MMBtu/yr
- Annual fuel energy avoided
- 3,301.7MMBtu/yr
- Annual fuel savings
- 28,065USD/yr
Calculation basis
- Steady drum solids
BD/S = F/(B − F); cycles = B/F - Water balance and screening bands
Feed = S + BD; make-up = feed − returned condensate - Flash and heat exchanger
f = (h_f,boiler − h_f,receiver)/h_fg,receiver; Q_BD = BD·(h_f,boiler − h_makeup)
Check the original case
Compare the site target with the 2,500 ppm screening band and check the corresponding blowdown flows.
- Blowdown / steam production6.51 %
- TDS cycles of concentration16.364 ×
- Blowdown flow1,366.9 lb/hr
- Annual fuel savings28,065 USD/yr
Formulas and assumptions
Steady drum solids
BD/S = F/(B − F); cycles = B/F
F is the effective feedwater TDS, B is the drum target and S is dry steam production. Conductivity is multiplied by an editable site factor. Zero feed TDS gives zero calculated continuous blowdown and unlimited theoretical cycles.
Water balance and screening bands
Feed = S + BD; make-up = feed − returned condensate
ABMA screening values are 3,500 ppm through 300 psig, 3,000 ppm above 300 through 450 psig, and 2,500 ppm above 450 through 600 psig. Use the verified OEM or site target when it is more restrictive.
Flash and heat exchanger
f = (h_f,boiler − h_f,receiver)/h_fg,receiver; Q_BD = BD·(h_f,boiler − h_makeup)