Continuous blowdown without recovery
A boiler sends continuous blowdown to a site cooling system. Estimate the gross annual heat and make-up water burden.
Inputs
Inputs
- Steam load
- 12,000 lb/hr
- Boiler pressure
- 150 psig
- Feedwater test
- TDS (ppm)
- Feedwater TDS
- 260 ppm
- Drum TDS limit source
- ABMA screening
- Steam returned as condensate
- 40 %
- Cold make-up temperature
- 68 °F
- Blowdown heat recovery
- Disabled
- Boiler efficiency
- 82 %
- Annual operating time
- 7,500 h/yr
- Currency
- USD
- Energy price
- 8.5 USD/MMBtu
Calculation results
- Blowdown / steam production
- 8.02%
- Blowdown flow
- 963lb/hr
- TDS cycles of concentration
- 13.462×
- Fresh make-up flow
- 8,163lb/hr
- Total boiler feedwater
- 12,963lb/hr
- Effective feedwater TDS
- 260ppm
- Drum TDS target
- 3,500ppm
- ABMA screening value
- 3,500ppm
- Gross annual blowdown heat
- 2,184.2MMBtu/yr
- Generated flash steam with recovery
- 0lb/hr
- Usable flash heat
- 0Btu/h
- Liquid HX heat
- 0Btu/h
- Annual heat recovered
- 0MMBtu/yr
- Annual unrecovered heat
- 2,184.2MMBtu/yr
- Annual fuel energy avoided
- 0MMBtu/yr
- Annual fuel savings
- 0USD/yr
Calculation basis
- Steady drum solids
BD/S = F/(B − F); cycles = B/F - Water balance and screening bands
Feed = S + BD; make-up = feed − returned condensate - Flash and heat exchanger
f = (h_f,boiler − h_f,receiver)/h_fg,receiver; Q_BD = BD·(h_f,boiler − h_makeup)
Check the original case
Fuel savings are zero in this configuration. Turning on recovery shows the scale of the opportunity.
- Blowdown / steam production8.02 %
- TDS cycles of concentration13.462 ×
- Blowdown flow963 lb/hr
- Annual fuel savings0 USD/yr
Formulas and assumptions
Steady drum solids
BD/S = F/(B − F); cycles = B/F
F is the effective feedwater TDS, B is the drum target and S is dry steam production. Conductivity is multiplied by an editable site factor. Zero feed TDS gives zero calculated continuous blowdown and unlimited theoretical cycles.
Water balance and screening bands
Feed = S + BD; make-up = feed − returned condensate
ABMA screening values are 3,500 ppm through 300 psig, 3,000 ppm above 300 through 450 psig, and 2,500 ppm above 450 through 600 psig. Use the verified OEM or site target when it is more restrictive.
Flash and heat exchanger
f = (h_f,boiler − h_f,receiver)/h_fg,receiver; Q_BD = BD·(h_f,boiler − h_makeup)
Usable vapor yields flash latent heat. The exchanger recovers an entered fraction of the remaining liquid sensible heat relative to make-up. Divide recovered heat by boiler efficiency to estimate fuel avoided.
Worked examples
Open a case to edit its inputs.