Deaerator Pegging Steam Calculator
Balance make-up, hot condensate, pegging steam and saturated vent losses to find deaerator outlet and net firing relief.
Inputs
Inputs
- Cold make-up flow
- 2,800 lb/hr
- Cold make-up temperature
- 68 °F
- Condensate return flow
- 7,200 lb/hr
- Condensate return temperature
- 190.4 °F
- Deaerator pressure
- 8 psig
- Pegging supply pressure
- 120 psig
- Vent / liquid outlet mass
- 0.2 %
- Boiler efficiency
- 82 %
Calculation results
- Mixed inlet temperature
- 156.21°F
- Deaerator saturation temperature
- 234.72°F
- Pegging steam required
- 818.2lb/hr
- Liquid feedwater outlet
- 10,796.6lb/hr
- Saturated vent vapor
- 21.6lb/hr
- Net boiler fuel-input relief
- 1.049MMBtu/h
- Preheat credit vs all-cold baseline
- 1,669,891.16Btu/h
- Boiler duty to generate pegging steam
- 809,676.95Btu/h
- Mixed inlet enthalpy
- 124.23Btu/lb
- Pegging inlet enthalpy
- 1,192.72Btu/lb
- Feedwater outlet enthalpy
- 203.13Btu/lb
- Vent vapor enthalpy
- 1,158.66Btu/lb
Calculation basis
- Mixed inlet
h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return) - Mass and energy
h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*) - Fuel-input relief
Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η
Formulas and assumptions
Mixed inlet
h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return)
The dry supply steam throttles at constant enthalpy. The liquid mix temperature is found by inverting the liquid enthalpy equation.
Mass and energy
h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*)
The vent is r times liquid outlet mass, and the outlet is (m_in + m_peg)/(1 + r). Vent and liquid exit as saturated phases at the deaerator pressure. The energy and mass balances assume steady state and no shell loss.
Fuel-input relief
Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η
Compare at equal external water inflow against an all-cold baseline. The credit includes hot return and subtracts the boiler duty required for pegging. Use site venting and dissolved oxygen requirements for commissioning.
Worked examples
Open a case to edit its inputs.