Idealized zero-vent energy balance
An ideal zero-vent calculation isolates inlet mixing and sensible heating for a 12 psig vessel.
Inputs
Inputs
- Cold make-up flow
- 2,800 lb/hr
- Cold make-up temperature
- 95 °F
- Condensate return flow
- 7,200 lb/hr
- Condensate return temperature
- 195.8 °F
- Deaerator pressure
- 12 psig
- Pegging supply pressure
- 120 psig
- Vent / liquid outlet mass
- 0 %
- Boiler efficiency
- 82 %
Calculation results
- Mixed inlet temperature
- 167.65°F
- Deaerator saturation temperature
- 243.69°F
- Pegging steam required
- 780.5lb/hr
- Liquid feedwater outlet
- 10,780.5lb/hr
- Saturated vent vapor
- 0lb/hr
- Net boiler fuel-input relief
- 0.885MMBtu/h
- Preheat credit vs all-cold baseline
- 1,491,005Btu/h
- Boiler duty to generate pegging steam
- 765,257.63Btu/h
- Mixed inlet enthalpy
- 135.69Btu/lb
- Pegging inlet enthalpy
- 1,192.72Btu/lb
- Feedwater outlet enthalpy
- 212.22Btu/lb
- Vent vapor enthalpy
- 1,161.84Btu/lb
Calculation basis
- Mixed inlet
h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return) - Mass and energy
h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*) - Fuel-input relief
Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η
Check the original case
Liquid outlet equals total inlet mass. The zero-vent case is a balance reference for comparison.
- Pegging steam required780.5 lb/hr
- Liquid feedwater outlet10,780.5 lb/hr
- Deaerator saturation temperature243.69 °F
- Net boiler fuel-input relief0.885 MMBtu/h
Formulas and assumptions
Mixed inlet
h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return)
The dry supply steam throttles at constant enthalpy. The liquid mix temperature is found by inverting the liquid enthalpy equation.
Mass and energy
h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*)
The vent is r times liquid outlet mass, and the outlet is (m_in + m_peg)/(1 + r). Vent and liquid exit as saturated phases at the deaerator pressure. The energy and mass balances assume steady state and no shell loss.
Fuel-input relief
Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η
Compare at equal external water inflow against an all-cold baseline. The credit includes hot return and subtracts the boiler duty required for pegging. Use site venting and dissolved oxygen requirements for commissioning.
Worked examples
Open a case to edit its inputs.