Worked example · Controls & protection
Culvert overtopping screening example
A low road crossing has a culvert smaller than the design storm demands. The lowest road crest is 3.2 ft above the inlet invert.
Inputs
Roadway culvert profile
Live resultsHeadwater reaches the road crest
Inlet control. Overtopping uses the actual road crest. HW/D has a separate 1.2 worksheet limit.
Calculation results
- HW / D
- 3.18
- Inlet HW
- 8.26 ft
- Outlet HW
- 7.65 ft
- Road clearance
- -5.06 ft
- Governing control
- Inlet
- Inlet condition
- Submerged
- Governing headwater depth
- 8.26 ft
- Headwater elevation
- 233.66 ft
- Road crest elevation
- 228.6 ft
- Reserve to HW/D 1.2
- -5.14 ft
- Critical depth
- 2.5 ft
- Barrel friction loss
- 1.78 ft
- Entrance + exit loss
- 3.82 ft
- Full-area barrel velocity
- 12.81 ft/s
Worked calculation
A negative road clearance indicates headwater above the crest. The full-flow estimate excludes flow diverted over the road.
HWin from Appendix A · HWout = h₀ + hfriction + (kₑ + 1)V²/(2g) − LS · HW = max(HWin, HWout).
The inlet calculation uses HDS-5 Table A.1. A linear blend between the published branch endpoints is used near inlet submergence. The outlet is a full-barrel energy screen with h₀ = max(TW, (d꜀ + D)/2), capped at D for the starting depth proxy before taking the maximum with tailwater. For outlet headwater below 0.75D, verify with a backwater calculation. The 1.2 ratio is a worksheet criterion. Road overtopping uses the surveyed road crest.
More worked examples
Open the main calculatorCulvert overtopping screening example
Inputs
- Total design flow
- 68 cfs
- Inlet configuration
- Round RCP · headwall
- Diameter or inside rise
- 2.6 ft
- Identical barrels
- 1
- Barrel length
- 80 ft
- Longitudinal grade
- 0.63 %
- Manning n
- 0.013
- Entrance loss kₑ
- 0.5
- Depth above outlet invert
- 2.3 ft
- Inlet invert elevation
- 225.4 ft
- Road crest above inlet invert
- 3.2 ft
Results
- HW / D
- 3.18
- Inlet HW
- 8.26 ft
- Outlet HW
- 7.65 ft
- Road clearance
- -5.06 ft
- Governing control
- Inlet
- Inlet condition
- Submerged
- Governing headwater depth
- 8.26 ft
- Headwater elevation
- 233.66 ft
- Road crest elevation
- 228.6 ft
- Reserve to HW/D 1.2
- -5.14 ft
- Critical depth
- 2.5 ft
- Barrel friction loss
- 1.78 ft
- Entrance + exit loss
- 3.82 ft
- Full-area barrel velocity
- 12.81 ft/s
Headwater reaches the road crest
Inlet control. Overtopping uses the actual road crest. HW/D has a separate 1.2 worksheet limit.
HWin from Appendix A · HWout = h₀ + hfriction + (kₑ + 1)V²/(2g) − LS · HW = max(HWin, HWout).
Screening worksheet · Verify design using project criteria and site data.