Chicago, Illinois

Morning fence shade in a Chicago courtyard

A courtyard gets delayed morning sun behind an eight-foot east wall, with a lower barrier to the south.

Try it. Set just the east wall height to zero. Compare the first direct-sun time to isolate the east wall’s contribution.

Inputs

US displays feet and 12-hour times. Metric displays meters and 24-hour times.

North is positive.
East is positive.
Use the offset on this date, including daylight saving.

Fence cross-section and direct-sun sweep

Fence section and bed sunlight timelineThe section shows the wall with the highest height-to-distance ratio. The timeline includes all walls: south 4 ft high at 9 ft, east 8 ft high at 6 ft, west 0 ft high at 10 ft. EAST WALL 8 ft2026-05-02 BED 6 ftSUNLIGHT AT BED12 AM6 AM12 PM6 PM12 AM
Direct sun with walls
9.38 h
Exposure
Full sun
Sun with open horizons
13.92 h
Sun lost to walls
4.55 h
Morning shade clears
10:23 AM
Afternoon sun ends
7:46 PM

Full sun means at least 6 hours. Part shade means 3 to under 6 hours. Your plant’s light requirements may vary.

Direct-sun windows
Yard modelLocal time intervals
Without walls5:50 AM – 7:46 PM
With walls10:23 AM – 7:46 PM

Follow the beam past each wall

The model checks whether a ray from the bed toward the Sun clears the southern, eastern, and western walls. Obstruction height and perpendicular distance are measured from the bed’s receiving point. Zero wall height removes that side.

Walls are treated as opaque and continuous along their own direction. Direct sunlight can arrive in multiple windows. The result describes geometric direct-beam hours, with no allowance for trees, skylight, weather, or surrounding buildings.

Open garden sunlight with the default settings

Common questions

Why can a Chicago east wall push first sun well past sunrise?

A low beam from the east may not clear the wall. The bed lights up once the beam rises high enough or swings away.

Can the model include gaps in the Chicago courtyard fence?

It assumes a continuous, opaque wall. Rays through gates and gaps need more detailed geometry.