Chamber pump-down time / Worked example
Baked UHV Preparation Chamber
An 85 L baked vessel starts at 1,000 Pa and targets 4 × 10⁻⁸ Pa after turbo handoff.
Inputs
Roots booster
Walls, seals and leaks
Live readout
Target vacuum met- Roughing time
- 65.24 s
- Backing-only roughing time
- 65.24 s
- Boosted roughing time
- 0 s
- High-vacuum stage
- 4.33 s
- Time to target
- 69.57 s
- Modeled ultimate pressure
- 1.067e-9 Pa
- Wall throughput at target
- 4.882e-9 Pa·m³/s
Reading this example
At this target, residual desorption and true leaks set the pressure floor. Compare the floor readout with the target first.
Model & assumptions
Roughing stages
t = (V/S) ln(Pₐ/Pᵦ)
The backing pump runs above the Roots switch pressure. Use combined speed below the switch, until the high-vacuum pump takes over. Enter chamber-effective speeds for all stages.
High-vacuum mass balance
V dP/dt = A[q∞ + q₁(1 + t/t₁)⁻ᵅ] + Qₗ − SₑP
The high-vacuum clock starts with wall age t₁. The solver integrates the decaying load with exponential chamber memory until pressure crosses the target. At α = 0 the reference wall rate is a steady load.
Ultimate pressure
P∞ = (Aq∞ + Qₗ)/Sₑ (α > 0)
The model rejects a target at or below the ultimate pressure. With a decaying wall load, a target can sit above the floor and still take longer than the 10¹² s search horizon.