Chamber pump-down time / Worked example
Booster Cut-In Below Turbo Handoff
A 160 L test vessel hands off at 15 Pa. The Roots cut-in is set lower, at 5 Pa.
Inputs
Roots booster
Walls, seals and leaks
Live readout
Target vacuum met- Roughing time
- 108.5 s
- Backing-only roughing time
- 108.5 s
- Boosted roughing time
- 0 s
- High-vacuum stage
- 8.956 s
- Time to target
- 117.5 s
- Modeled ultimate pressure
- 1.422e-7 Pa
- Wall throughput at target
- 4.757e-5 Pa·m³/s
Reading this example
The Roots stage adds no speed in this roughing interval. Move the cut-in inside the roughing window to see its modeled effect.
Model & assumptions
Roughing stages
t = (V/S) ln(Pₐ/Pᵦ)
The backing pump runs above the Roots switch pressure. Use combined speed below the switch, until the high-vacuum pump takes over. Enter chamber-effective speeds for all stages.
High-vacuum mass balance
V dP/dt = A[q∞ + q₁(1 + t/t₁)⁻ᵅ] + Qₗ − SₑP
The high-vacuum clock starts with wall age t₁. The solver integrates the decaying load with exponential chamber memory until pressure crosses the target. At α = 0 the reference wall rate is a steady load.
Ultimate pressure
P∞ = (Aq∞ + Qₗ)/Sₑ (α > 0)
The model rejects a target at or below the ultimate pressure. With a decaying wall load, a target can sit above the floor and still take longer than the 10¹² s search horizon.