Outgassing & leak budget / Worked example
Baked Semiconductor Chamber Budget
A baked 316L chamber has unfinished aluminum fixtures and a small aggregate permeation load.
Inputs
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6
Live readout
Target vacuum met- Total gas load
- 9.09e-7 Pa·m³/s
- Required effective speed
- 113.6 L/s
- Predicted base pressure
- 3.246e-6 Pa
- Candidate speed reserve
- 59.42%
Gas load ranking
| Source | Gas load | Share |
|---|---|---|
| Surface 2Aluminum 6061 | 7.8e-7 Pa·m³/s | 85.81% |
| O-ringO-ring permeation | 8e-8 Pa·m³/s | 8.801% |
| Surface 1316L, baked 24 h at 150 °C | 2.9e-8 Pa·m³/s | 3.19% |
| He leakHelium leak allowance | 2e-8 Pa·m³/s | 2.2% |
Reading this example
Use the source ranking to decide whether conditioning the fixtures could matter more than adding pumping speed.
Model & assumptions
Material load
Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ
Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.
Pressure and speed
P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ
The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.