Outgassing & leak budget / Worked example

Unbaked Stainless Load Lock Budget

A compact load lock is cycled frequently. Unbaked stainless walls and a small FKM seal dominate the assumed surface load.

Readout ↓

Inputs

Pressure target and fixed loads
Pa
L/s
Pa·m³/s
Pa·m³/s
Chamber surface 1
m²
Pa·m³/(s·m²)
Chamber surface 2
m²
Pa·m³/(s·m²)
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6

Live readout

Base pressure above target
Total load1.262e-5Pa·m³/sNeeded speed126.2L/sBase pressure3.606e-4PaSpeed reserve-260.6%Gas load by sourceChamberSurface 187.2%Surface 29.51%O-ring3.17%He leak0.158%Speed demand / available speedDemand126 L/sAvailable35 L/sReserve-261%
Total gas load
1.262e-5 Pa·m³/s
Required effective speed
126.2 L/s
Predicted base pressure
3.606e-4 Pa
Candidate speed reserve
-260.6%

Gas load ranking

SourceGas loadShare
Surface 1304L / 316L stainless, unbaked 1.1e-5 Pa·m³/s 87.16%
Surface 2FKM / Viton, unbaked 1.2e-6 Pa·m³/s 9.509%
O-ringO-ring permeation 4e-7 Pa·m³/s 3.17%
He leakHelium leak allowance 2e-8 Pa·m³/s 0.1585%

    Reading this example

    Treat the as-vented rate and time since closure as inputs. The pressure target can expose more required speed than the pump delivers.

    Model & assumptions

    Material load

    Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ

    Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.

    Pressure and speed

    P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ

    The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.