Outgassing & leak budget / Worked example
Six-Surface Optical Bench Budget
The optical bench contains baked steel, aluminum mounts, FKM seals, PTFE guides, Kapton wiring and a borosilicate panel.
Inputs
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6
Live readout
Target vacuum met- Total gas load
- 3.158e-6 Pa·m³/s
- Required effective speed
- 157.9 L/s
- Predicted base pressure
- 9.288e-6 Pa
- Candidate speed reserve
- 53.56%
Gas load ranking
| Source | Gas load | Share |
|---|---|---|
| Surface 5Kapton | 1.2e-6 Pa·m³/s | 38% |
| Surface 2Aluminum 6061 | 5.4e-7 Pa·m³/s | 17.1% |
| Surface 6Borosilicate | 4.8e-7 Pa·m³/s | 15.2% |
| Surface 4PTFE | 4.4e-7 Pa·m³/s | 13.93% |
| Surface 3FKM / Viton, baked | 3.4e-7 Pa·m³/s | 10.77% |
| O-ringO-ring permeation | 8e-8 Pa·m³/s | 2.533% |
| Surface 1316L, baked 24 h at 150 °C | 5.8e-8 Pa·m³/s | 1.837% |
| He leakHelium leak allowance | 2e-8 Pa·m³/s | 0.6333% |
Reading this example
The Pareto list makes small areas with high specific loads visible alongside the large metal area.
Model & assumptions
Material load
Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ
Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.
Pressure and speed
P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ
The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.