Outgassing & leak budget / Worked example

Baked Semiconductor Chamber Budget

A baked 316L chamber has unfinished aluminum fixtures and a small aggregate permeation load.

Readout ↓

Inputs

Pressure target and fixed loads
Pa
L/s
Pa·m³/s
Pa·m³/s
Chamber surface 1
m²
Pa·m³/(s·m²)
Chamber surface 2
m²
Pa·m³/(s·m²)
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6

Live readout

Target vacuum met
Total load9.09e-7Pa·m³/sNeeded speed113.6L/sBase pressure3.246e-6PaSpeed reserve59.42%Gas load by sourceChamberSurface 285.8%O-ring8.8%Surface 13.19%He leak2.2%Speed demand / available speedDemand114 L/sAvailable280 L/sReserve59.4%
Total gas load
9.09e-7 Pa·m³/s
Required effective speed
113.6 L/s
Predicted base pressure
3.246e-6 Pa
Candidate speed reserve
59.42%

Gas load ranking

SourceGas loadShare
Surface 2Aluminum 6061 7.8e-7 Pa·m³/s 85.81%
O-ringO-ring permeation 8e-8 Pa·m³/s 8.801%
Surface 1316L, baked 24 h at 150 °C 2.9e-8 Pa·m³/s 3.19%
He leakHelium leak allowance 2e-8 Pa·m³/s 2.2%

    Reading this example

    Use the source ranking to decide whether conditioning the fixtures could matter more than adding pumping speed.

    Model & assumptions

    Material load

    Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ

    Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.

    Pressure and speed

    P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ

    The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.