Outgassing & leak budget / Worked example

Six-Surface Optical Bench Budget

The optical bench contains baked steel, aluminum mounts, FKM seals, PTFE guides, Kapton wiring and a borosilicate panel.

Readout ↓

Inputs

Pressure target and fixed loads
Pa
L/s
Pa·m³/s
Pa·m³/s
Chamber surface 1
m²
Pa·m³/(s·m²)
Chamber surface 2
m²
Pa·m³/(s·m²)
Chamber surface 3
m²
Pa·m³/(s·m²)
Chamber surface 4
m²
Pa·m³/(s·m²)
Chamber surface 5
m²
Pa·m³/(s·m²)
Chamber surface 6
m²
Pa·m³/(s·m²)

Live readout

Target vacuum met
Total load3.158e-6Pa·m³/sNeeded speed157.9L/sBase pressure9.288e-6PaSpeed reserve53.56%Gas load by sourceChamberSurface 538%Surface 217.1%Surface 615.2%Surface 413.9%Other15.8%Speed demand / available speedDemand158 L/sAvailable340 L/sReserve53.6%
Total gas load
3.158e-6 Pa·m³/s
Required effective speed
157.9 L/s
Predicted base pressure
9.288e-6 Pa
Candidate speed reserve
53.56%

Gas load ranking

SourceGas loadShare
Surface 5Kapton 1.2e-6 Pa·m³/s 38%
Surface 2Aluminum 6061 5.4e-7 Pa·m³/s 17.1%
Surface 6Borosilicate 4.8e-7 Pa·m³/s 15.2%
Surface 4PTFE 4.4e-7 Pa·m³/s 13.93%
Surface 3FKM / Viton, baked 3.4e-7 Pa·m³/s 10.77%
O-ringO-ring permeation 8e-8 Pa·m³/s 2.533%
Surface 1316L, baked 24 h at 150 °C 5.8e-8 Pa·m³/s 1.837%
He leakHelium leak allowance 2e-8 Pa·m³/s 0.6333%

    Reading this example

    The Pareto list makes small areas with high specific loads visible alongside the large metal area.

    Model & assumptions

    Material load

    Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ

    Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.

    Pressure and speed

    P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ

    The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.