Consumable estimating
Short SMAW repair with low arc-on factor
A short repair requires repeated repositioning and electrode changes. Use a conservative 12% arc-on factor for the quote.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsCost allowance · Filler + labor vs 12 USD.
Result details
| Filled cross-section | 0.038 in² |
|---|---|
| Filler to purchase | 0.491 lb |
| Arc-on time | 13.36 min |
| Filler and labor cost | 172.12 USD |
| Base weld section | 0.031 in² |
| Deposited volume | 1.13 in³ |
| Theoretical deposited mass | 0.319 lb |
| Consumable loss | 0.172 lb |
| Deposition efficiency | 65 % |
| Net deposition rate | 1.43 lb/h |
| Gross consumption rate | 2.2 lb/h |
| Paid shop time | 111.32 min |
| Filler cost | 1.42 USD |
| Labor cost | 170.69 USD |
| Budget margin | -160.12 USD |
Worked example
Starting inputs
- Weld profile
- Single fillet
- Equal leg size
- 0.25 in
- Seam length
- 2.5 ft
- Extra weld area
- 20 %
- Welding process
- SMAW
- Net deposition rate
- 1.433005 lb/h
- Arc-on factor
- 12 %
Baseline results
- Filled cross-section
- 0.038 in²
- Filler to purchase
- 0.491 lb
- Arc-on time
- 13.36 min
- Filler and labor cost
- 172.12 USD
A filled section of 0.038 in² over 2.5 ft deposits 0.319 lb. At 65 % process yield, allow 0.491 lb of consumables.
Try it. When the seam is short, paid time can dominate the estimate even when the electrode mass is small.
Calculation method
A = A₀(1 + r) · m = ρAL · mᵦ = m / ηd
An equal-leg fillet starts at w²/2 per side. A symmetric single V has section g·t + (t − f)²·tan(α/2). A balanced double V halves the bevel term at the same total root face. For a single bevel, use g·t + ½(t − f)²·tan(β). Reinforcement adds the entered percentage to the full base section.
The model assumes uniform density and a constant net deposition rate. Divide deposited mass by the process yield to estimate purchases. Divide arc-on time by the arc-on factor to obtain paid shop time. The cost screen compares filler plus labor against your allowance. Add gas, flux, setup or handling to your estimate separately.