Consumable estimating
Weld Filler Metal Weight & Cost
Estimate weld metal, filler purchases, arc-on time and labor from a fillet or a prepared groove.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsCost allowance · Filler + labor vs 250 USD.
Result details
| Filled cross-section | 39.6 mm² |
|---|---|
| Filler to purchase | 4.549 kg |
| Arc-on time | 69.94 min |
| Filler and labor cost | 235.61 USD |
| Base weld section | 36 mm² |
| Deposited volume | 475.2 cm³ |
| Theoretical deposited mass | 3.73 kg |
| Consumable loss | 0.819 kg |
| Deposition efficiency | 82 % |
| Net deposition rate | 3.2 kg/h |
| Gross consumption rate | 3.9 kg/h |
| Paid shop time | 199.84 min |
| Filler cost | 29.11 USD |
| Labor cost | 206.5 USD |
| Budget margin | 14.39 USD |
Calculation method
A = A₀(1 + r) · m = ρAL · mᵦ = m / ηd
An equal-leg fillet starts at w²/2 per side. A symmetric single V has section g·t + (t − f)²·tan(α/2). A balanced double V halves the bevel term at the same total root face. For a single bevel, use g·t + ½(t − f)²·tan(β). Reinforcement adds the entered percentage to the full base section.
The model assumes uniform density and a constant net deposition rate. Divide deposited mass by the process yield to estimate purchases. Divide arc-on time by the arc-on factor to obtain paid shop time. The cost screen compares filler plus labor against your allowance. Add gas, flux, setup or handling to your estimate separately.