ASPHALTPAVELAB / PAVEMENT DESIGN WORKSHEET
Long-haul interstate segment
Asphalt Tonnage, Tack & Haul · US customary units
Plant below paver demand. Marker shows plant output relative to paver demand. The tack check uses the selected surface band.
Inputs
| Section length | 7,200 ft |
|---|---|
| Paving width | 12 ft |
| Compacted thickness | 2.75 in |
| Compacted mix SG Gₘᵦ | 2.42 |
| Purchase allowance | 5% |
| Receiving surface | Existing asphalt |
| Residual tack rate | 0.05 gal/yd² |
| Binder in supplied emulsion | 67% |
| Added water in final spray | 50% |
| Plant production | 325 US tons/h |
| Paver travel speed | 27 ft/min |
| Truck payload | 25 US tons |
| Round-trip cycle | 120 min |
Results
| Gross HMA order | 1,569.7 US tons |
|---|---|
| Diluted tack volume | 1,432.8 US gal |
| Theoretical paver rate | 336.4 US tons/h |
| Fleet at requested paver rate | 27 |
| Net compacted HMA | 1,495 US tons |
| Compacted mix density | 151.01 lb/ft³ |
| Tack coverage area | 9,600 yd² |
| Route length | 1.364 mi |
| Residual binder volume | 480 US gal |
| Undiluted emulsion volume | 716.4 US gal |
| Diluted distributor bar rate | 0.149 gal/yd² |
| Plant/paver limited throughput | 325 US tons/h |
| Fleet at feasible throughput | 26 |
| Gross mix supply time | 4.83 h |
| Reference residual tack minimum | 0.04 gal/yd² |
| Reference residual tack maximum | 0.07 gal/yd² |
Check tack rate and dilution against the contract and emulsion supplier. The steady-state haul model assumes uniform payload and cycle time.