ConcreteEarthLab

Worked example

No-splice takeoff for a narrow #3 walkway mat

A short access walkway uses one #3 mat and standard 20 ft stock. Each straight run fits in one stick after edge cover.

Inputs

Measurement system
ft
ft
in
Center to center for bars running along Y.
in
Center to center for bars running along X.
in
ft
Common stock lengths are 20 ft and 6 m. Set the length your supplier carries.
d
Use the lap from the structural drawings when available.
SLAB REBAR MATPlan of bar runs, clear cover, and the two spacing directions. SLAB REBAR MAT X 18 ftY 5 ft#3 · 6 along X · 13 along Y0 laps

Estimate

Rebar weight incl. laps
63.26 lb
  • Counts assume one straight mat. Confirm cover, development, stagger and lap with the structural drawings.
Weight · equivalent
28.7 kg
Continuous grid runs
19
Runs along X
6
Runs along Y
13
Actual X center spacing
17.72 in
Actual Y center spacing
11.33 in
Lap per splice
15 in
Lap joints
0
Stock pieces before offcut reuse
19
Grid intersections
78
Length before laps
168.25 ft
Cut length incl. laps
168.25 ft
Cut length · equivalent
51.283 m
Download

Working this example

Starting estimate 63.26 lbRebar weight incl. laps

Look for multiple 5 ft cross pieces from a single stick when building the actual stock purchase list.

See the calculator formulas and assumptions

Questions & answers

Does a 40d setting add length when the walkway runs fit in stock?

Lap length adds material only when a run requires more than one piece. These dimensions produce zero lap joints.

Why can the walkway fabrication order use fewer sticks than the stock-piece count?

The estimator lists one stock piece for each unspliced run. Several short cross pieces can be cut from one purchased stick.