Methodology
Equations, input conventions and screening limits for the eight CorrosionRateLab calculators.
Using a screen in an engineering review
Confirm material, geometry, measurement uncertainty and applicable standards before using a result for design or operations. A site-specific assessment is required to establish inspection dates, regulatory pressure limits or corrosion protection criteria.
Weight-loss corrosion rate
Open calculatorNormalize the exposure
Use mass loss W in grams, total exposed area A in cm², duration T in hours and density ρ in g/cm³. Include both faces and edges if these were exposed.
Calculate penetration and areal loss
Average penetration = K × W ÷ (A × T × ρ). K is 87,600 for mm/yr and 3,450,000 for mpy. Areal mass loss = 240,000 × W ÷ (A × T) in g/(m²·day). The two published K values are independently rounded.
Convert using equivalent weight
The Faraday relation is mm/yr = 0.00327 × i × EW/ρ, where i is in µA/cm². Divide by the coefficient to convert back. In either Faraday mode, mpy = mm/yr ÷ 0.0254.
Remaining life & UT interval
Open calculatorCompare short and long histories
Short-term rate = (previous UT − current UT) ÷ elapsed years. Long-term rate = (installed thickness − current UT) ÷ years in service when both inputs are given. Use the larger credible rate.
Measure the retirement margin
Allowance = current thickness − retirement thickness. At or below retirement, the screen returns zero life and zero interval. Confirm a rising thickness trend before assigning a rate.
Apply the half-life rule
Remaining life = allowance ÷ governing rate. The screening interval is the smaller of half the remaining life and the selected cap. A zero measured rate produces a cap-only interval and no finite life estimate.
B31G pipeline strength
Open calculatorCalculate the loss and length ratios
Use d/t and z = L²/(D × t). Stop at d/t ≥ 0.80. Use matched dimensions and a verified sound wall thickness.
Evaluate the two profiles
Original B31G uses 1.1 × SMYS. For z ≤ 20, use 2d/(3t) and M = √(1 + 0.8z) in the geometry ratio. For z > 20, use the long-defect ratio (1 − d/t). Modified B31G uses SMYS + 10 ksi and 0.85d/t. M = √(1 + 0.6275z − 0.003375z²) for z ≤ 50, or 0.032z + 3.3 above 50.
Screen the pressure
For each short Original or Modified profile, multiply 2tSflow/D by (1 − area fraction)/(1 − area fraction/M). For long Original use its geometry ratio directly. Screened safe pressure is the lower of F × predicted failure pressure and the intact design pressure 2t × SMYS × F/D. ERF = operating MAOP ÷ screened safe pressure.
Sacrificial anode sizing
Open calculatorEstimate demand at three stages
For each stage, demand = protected area × coating breakdown × corresponding bare current density. Convert percent to a fraction and mA/m² to A/m².
Calculate net alloy mass
M = mean demand × 8,760 × design years ÷ (capacity × utilization). Divide by net mass per anode and round up. Preset capacities are 2,000, 780 and 1,100 A·h/kg for aluminum, zinc and magnesium, respectively.
Check final and initial current
For a slender stand-off anode, R = ρ[ln(4L/r) − 1]/(2πL), with L ≥ 4r. Current per anode is ΔE/R. Round final demand divided by single-anode current up and select the larger of the mass and final current counts. The additional initial screen uses the same final geometry as a conservative check.
ICCP groundbed resistance
Open calculatorEstimate a single anode
For a shallow vertical electrode, R = ρ[ln(8L/d) − 1]/(2πL). Use the conductive coke column diameter and length when it functions as an equivalent electrode.
Apply trench depth if horizontal
With centerline depth h, set s = 2h and q = √(s² + L²). Dwight’s horizontal bracket is ln[4L(L + q)/(d × s)] + (s − q)/L − 1. Multiply by ρ/(2πL).
Estimate row interaction
With N > 1, add ρ × ln(0.656N)/(πNS) to R_single/N for center spacing S. This Sunde term is for a vertical row. Applying it to parallel horizontal trenches is an approximation. The voltage drop is design current × modeled bed resistance.
ICCP rectifier sizing
Open calculatorBuild the DC voltage budget
Required voltage = current × (groundbed + structure + loop cable resistance) + opposing back-EMF. Multiply by the design factor for the minimum design voltage.
Check the tap and AC supply
Use the first listed tap at or above the design voltage, or enter a nameplate tap. DC kW = operating voltage × current ÷ 1,000. AC kW = DC kW ÷ efficiency. AC kVA = AC kW ÷ power factor. Rated load at the selected tap is shown separately.
Estimate running cost
AC kW × annual runtime gives kWh/yr. Multiply by the entered tariff for annual cost. Headroom is (tap − operating voltage) ÷ operating voltage.
PREN & galvanic area ratio
Open calculatorCalculate each composition index
Standard PREN = Cr + 3.3Mo + 16N. With tungsten use PREN_W = Cr + 3.3(Mo + 0.5W) + 16N. Enter each element in mass percent.
Read the comparison bands
The bands are below 25, 25 to below 32, 32 to 40 inclusive, and above 40. The highest band denotes a seawater candidate for further assessment.
Compare the exposed areas
The proxy multiplies the uncoupled anode rate by max(1, cathode/anode area). Area contrast is low up to 1, raised above 1 through 10, and high above 10. These are comparison bands for the area effect.
CO₂ sweet corrosion rate
Open calculatorFind CO₂ partial pressure
Multiply absolute pressure in bar by the gas-phase CO₂ mole fraction. Convert temperature to kelvin before evaluating either equation.
Correct for fugacity
log₁₀(a) = (0.0031 − 1.4/T_K) × P_bar. The fugacity f is a × P_CO₂. The uninhibited rate is 10^[5.8 − 1710/T_K + 0.67 log₁₀(f)] in mm/yr. Zero CO₂ gives a zero term directly.
Apply the chosen net credit
Multiply by (1 − η), where η is the credited efficiency fraction for a pH effect, protective scale, inhibitor or their measured combined effect. Convert mm/yr to mpy by dividing by 0.0254.
Units and unavailable values
US and SI views use the same stored input values. A dash indicates an unavailable, inapplicable or withheld result. Exports include unrounded model values. Worked examples are illustrative and editable.