ASME B30.5 · OSHA 1926.1414

Four-part block with bronze sheave bearings

A 47,500 lb gross suspended load uses four parts and two lead wraps. The bearing assumption is 0.96 per wrap.

Inputs

Hook load and reeving
lb
lbf
Sheave and drum
in
in
:1
in
ft
in
Back to results ↑

Results

Static screeningEdit inputs ↓
Block reeving and drum leadFAST-LINE PULL13,684.6lbfROPE FACTOR6.21:1SHEAVE D/d20:1FLEET ANGLE1.27°FIXED BLOCKTRAVELING BLOCKFast lineDead endD/d 20Fleet 1.27°Rope pull limit80.5%Required / actual D/d90%Fleet angle limit63.65%Running ropeFast lineBlock centerlineLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results

Compare these results with the approved equipment and lift plan.

Estimated fast-line pull
13,684.6 lbf
Available rope design factor
6.21 :1
Sheave pitch to rope diameter
20 :1
Worst drum fleet angle
1.27 °
Friction-adjusted parts
3.47
Overall reeving efficiency
86.78 %
Rope pull at entered design factor
17,000 lbf

Each successive supporting part contributes less line tension. Compare the result with ideal pull at four lossless parts.

Estimated fast-line pull 13,684.6 lbf · Available rope design factor 6.21 :1

Effective parts

Nₑ = ηᵏ × Σ ηⁱ, i = 0 to N − 1

η is efficiency per wrap. k counts lead sheaves before the first supporting part. Fast-line pull is suspended weight divided by Nₑ.

Rope and sheave

Design factor = MBS / P; D/d = Dpitch / drope

Use the rope maker’s minimum breaking strength and the OEM’s minimum pitch-diameter ratio.

Fleet angle

β = atan((drum width/2 + |offset|) / lead)

Use the furthest first-layer winding position. Compare with 1.5° smooth or 2.0° grooved as the entered drum-type screen.

Compare line pull with the OEM winch rating at the working drum layer and confirm compatible reeving, rope construction, termination efficiency and sheave sizing. A 3.5:1 design factor requires equipment- and use-specific review under the applicable OSHA provisions.