Effective parts
Nₑ = ηᵏ × Σ ηⁱ, i = 0 to N − 1
η is efficiency per wrap. k counts lead sheaves before the first supporting part. Fast-line pull is suspended weight divided by Nₑ.
ASME B30.5 · OSHA 1926.1414
A 28 mm rope runs over a 420 mm pitch-diameter sheave. The project input calls for a minimum D/d of 18.
Schematic geometry. Margin bars mark 100% of the entered limit.
A workable line pull leaves the diameter-ratio check independent. Consult the rope and equipment manufacturers for the required minimum.
Estimated fast-line pull 46.46 kN · Available rope design factor 10.98 :1
Nₑ = ηᵏ × Σ ηⁱ, i = 0 to N − 1
η is efficiency per wrap. k counts lead sheaves before the first supporting part. Fast-line pull is suspended weight divided by Nₑ.
Design factor = MBS / P; D/d = Dpitch / drope
Use the rope maker’s minimum breaking strength and the OEM’s minimum pitch-diameter ratio.
β = atan((drum width/2 + |offset|) / lead)
Use the furthest first-layer winding position. Compare with 1.5° smooth or 2.0° grooved as the entered drum-type screen.
Compare line pull with the OEM winch rating at the working drum layer and confirm compatible reeving, rope construction, termination efficiency and sheave sizing. A 3.5:1 design factor requires equipment- and use-specific review under the applicable OSHA provisions.
CraneRiggingLab · Lift screening worksheet
ASME B30.5 · OSHA 1926.1414 · SI · kg
Screening estimates only. Have a qualified rigger and a professional engineer (PE), where required, review the lift plan. Use the OEM chart for the actual configuration.
Compare line pull with the OEM winch rating at the working drum layer and confirm compatible reeving, rope construction, termination efficiency and sheave sizing. A 3.5:1 design factor requires equipment- and use-specific review under the applicable OSHA provisions.