ASME B30.5 · OSHA 1926.1402

Corner-share screen for an unloaded crane

An unloaded crane still carries 156,000 lb of operating weight including counterweight. A setup case uses a 62% peak share.

Inputs

Peak reaction
lb
lb
lb
%
Pad and ground
ft
in
in
psf
Use the verified allowable for this crane set-up.
Back to results ↑

Results

Static screeningEdit inputs ↓
Outrigger and mat sectionPEAK REACTION97,774lbfGROUND PRESS2,093.91psfBEARING AREA46.69ft²SOIL USE55.7%JACK REACTION45° spreadMatSoilEffective contactSoil bearing limit55.7%Applied reactionMat load spreadGround contactLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results
  • Estimated corner share selected. Use the peak OEM reaction for the complete lift path.
  • The 45° spread reaches only part of the pad footprint in this model.
Peak reaction at one pad
97,774 lbf
Effective ground pressure
2,093.91 psf
Effective bearing area
46.69 ft²
Allowable pressure used
55.7 %
Effective pressure in psi
14.54 psi
Full-footprint pressure
1,527.72 psf
Effective width or diameter
6.83 ft
Area needed at entered limit
26.01 ft²
Entered allowable pressure
3,759.38 psf

Keep crane weight and peak reaction in the calculation with zero payload. The OEM setup reaction remains the controlling input.

Peak reaction at one pad 97,774 lbf · Effective ground pressure 2,093.91 psf

Peak corner reaction

R = (Wcrane + Wload + Wrigging) × f

Enter the highest OEM reaction over the full lift path when available. The corner-share option is a provisional estimate.

Effective contact

Dₑ = min(Dpad, Dfoot + 2t)

Assume centered load and a 45° spread through the mat thickness t. Apply the limit on each rectangular axis. For round pads use πDₑ²/4.

Bearing pressure

p = R / Aₑ

Compare with the site-specific allowable pressure. Full-pad pressure is a reference and assumes complete load distribution.

Use a verified geotechnical bearing value and OEM outrigger reactions. Have pad or mat strength, effective bearing, settlement, slope, underground services and voids checked separately.