Worked example · Tray hydraulics
Dense-vapor fractionator
Size the net vapor area and shell diameter, then compare jet-flood approach at a candidate shell ID.
A pressurized column carries 2,400 actual m³/h at a vapor density of 22 kg/m³.
- Flood speed
- 0.3947 m/s
- Required ID
- 1.767 m
- % flood
- 82 %
- Net area
- 2.06 m²
Crossflow tray and downcomer
Live schematicReview hydraulic margins at the maximum expected load.
Calculation inputs
- Liquid density ρL
- 650 kg/m³
- Vapor density ρV
- 22 kg/m³
- Surface tension σ
- 14 mN/m
- Liquid / vapor mass ratio
- 1.3
- Tray spacing TS
- 750 mm
- Foaming / system factor
- 0.9
- Downcomer area
- 16 %
- Vapor flow Qv
- 2,400 Am³/h
- Design flood target
- 82 %
- Check shell ID
- 0 m
Worked solution
- Correct the Fair capacity
The flow parameter is 0.2392. The reference factor 0.08814 m/s becomes 0.07387 m/s after tension and system corrections.
- Convert vapor load to area
The density term gives Uf = 0.3947 m/s. Divide the vapor flow in m³/s by Uf and the target fraction. The net area is 2.06 m² and the total area is 2.452 m².
- Check the shell
The required ID is 1.767 m. At the checked ID of 1.767 m, the flood approach is 82 % with 3 pp to the 85% marker.
The density contrast and liquid load change both the Fair parameter and the flood velocity. The derivation uses SI units.
| Fair flow parameter FLV | 0.2392 |
|---|---|
| Fair capacity factor at reference tension | 0.08814 m/s |
| Corrected capacity factor Csb | 0.07387 m/s |
| Required total shell area | 2.452 m² |
| Checked shell ID | 1.767 m |
| Checked net vapor area | 2.06 m² |
| Checked downcomer area | 0.3924 m² |
| Operating net vapor velocity | 0.3236 m/s |
| Margin to 80% flood | -2 pp |
| Margin to 85% flood | 3 pp |
Calculation inputs
Live updates
Equations and assumptions
- Fair chart fit
- FLV = (L/V)√(ρV/ρL)
- Corrected capacity
- Csb = C20 · (σ/20)^0.2 · SF
- Flood velocity
- Uf = Csb √[(ρL − ρV)/ρV]
- Area basis
- At = Qv / [Uf · target · (1 − Ad/At)]
The Lygeros–Magoulas fit to Fair data uses tray spacing in meters and the reference surface tension of 20 mN/m. Apply the system factor to account for foaming or service derating.
The meter marks 80% of predicted jet flood. The 80–85% operating band is a screening range. Downcomer area is reserved in the net-area calculation. Detailed backup, froth height, weeping and entrainment need tray hardware data.