Worked example · Tray hydraulics
High load in an existing shell
Size the net vapor area and shell diameter, then compare jet-flood approach at a candidate shell ID.
Check a 1.8 m shell under higher-than-design vapor throughput.
- Flood speed
- 1.222 m/s
- Required ID
- 2.115 m
- % flood
- 107.6 %
- Net area
- 3.09 m²
Crossflow tray and downcomer
Live schematicIncrease the operating area or reduce the vapor load.
Calculation inputs
- Liquid density ρL
- 790 kg/m³
- Vapor density ρV
- 4.2 kg/m³
- Surface tension σ
- 21 mN/m
- Liquid / vapor mass ratio
- 0.9
- Tray spacing TS
- 600 mm
- Foaming / system factor
- 0.9
- Downcomer area
- 12 %
- Vapor flow Qv
- 10,600 Am³/h
- Design flood target
- 78 %
- Check shell ID
- 1.8 m
Worked solution
- Correct the Fair capacity
The flow parameter is 0.06562. The reference factor 0.09826 m/s becomes 0.0893 m/s after tension and system corrections.
- Convert vapor load to area
The density term gives Uf = 1.222 m/s. Divide the vapor flow in m³/s by Uf and the target fraction. The net area is 3.09 m² and the total area is 3.512 m².
- Check the shell
The required ID is 2.115 m. At the checked ID of 1.8 m, the flood approach is 107.6 % with -22.64 pp to the 85% marker.
A positive spare area at the target diameter does not imply a margin in the entered shell. Read the actual flood fraction. The derivation uses SI units.
| Fair flow parameter FLV | 0.06562 |
|---|---|
| Fair capacity factor at reference tension | 0.09826 m/s |
| Corrected capacity factor Csb | 0.0893 m/s |
| Required total shell area | 3.512 m² |
| Checked shell ID | 1.8 m |
| Checked net vapor area | 2.239 m² |
| Checked downcomer area | 0.3054 m² |
| Operating net vapor velocity | 1.315 m/s |
| Margin to 80% flood | -27.64 pp |
| Margin to 85% flood | -22.64 pp |
Calculation inputs
Live updates
Equations and assumptions
- Fair chart fit
- FLV = (L/V)√(ρV/ρL)
- Corrected capacity
- Csb = C20 · (σ/20)^0.2 · SF
- Flood velocity
- Uf = Csb √[(ρL − ρV)/ρV]
- Area basis
- At = Qv / [Uf · target · (1 − Ad/At)]
The Lygeros–Magoulas fit to Fair data uses tray spacing in meters and the reference surface tension of 20 mN/m. Apply the system factor to account for foaming or service derating.
The meter marks 80% of predicted jet flood. The 80–85% operating band is a screening range. Downcomer area is reserved in the net-area calculation. Detailed backup, froth height, weeping and entrainment need tray hardware data.