Worked example

Gas used during arc-on 3.75 ft³

  1. Set two runs of 6 ft so the total bead length is 144 in. At 16 in/min the two seams take nine minutes of arc time.
  2. Scale the 25 ft³/h regulator setting by 9/60 h. The stored cylinder capacity affects remaining runtime without changing the gas used per bead.

Before using this result. Measure actual travel and check the WPS. Allow additional gas for the number of restarts and any preflow or postflow.

Formulas and assumptions

Arc energy = 60 VI / (1,000 v)
With v in mm/min the result is kJ/mm. Use in/min for kJ/in. Net heat input multiplies arc energy by the entered arc efficiency.
Fillet area = ab/2
A flat-faced 90° fillet is a right triangle. The throat normal to the face is ab/√(a² + b²).
Filler mass = area × run length × runs × density / ηd
Divide the ideal deposited mass by the fractional deposition efficiency. Convert length and density to consistent units.
Gas volume = flow × arc-on time
Runtime uses cylinder free volume after reserve. Divide by the selected flow at matching reference conditions.

Engineering references

Frequently asked questions

Should I enter 6 ft or 12 ft when both sides are welded?

Enter 6 ft per run and set two runs. A single 12 ft run gives the same ideal consumption when both beads use the same settings.

How can I estimate gas when the two sides have different flow rates?

Calculate each seam with its own flow and travel speed, then sum their gas volumes.