Worked example · Pull replenishment
Connector Kanban at a container threshold
Check a connector loop sitting exactly at three container loads before testing a demand or lead-time increase.
Cards = ceil(Demand × Lead time × (1 + Buffer) ÷ Bin qty)
Baseline reading
The requirement is 144 connectors after buffer, exactly three 48-piece containers. A meaningful increase above that boundary requires a fourth card.
What to test
Try the next month’s demand forecast. Compare an extra container against faster replenishment from the stockroom.
Worksheet inputs
Inputs
Results
- Kanban cards or containers
- 3
- Maximum loop units
- 144
- Modeled average WIP
- 84 units
- Lead-time demand
- 120 units
- Requested safety stock
- 24 units
- Reserve after container rounding
- 24 units
- Annual inventory turns
- 178.57×
- Average capital in loop
- $210.00
- Maximum capital in loop
- $360.00
Model notes
Lead time starts when consumption sends the signal and ends when replenished stock can be used. Keep demand days and lead-time days on the same operating calendar.
The average models a straight drawdown from full inventory to the remaining reserve during a lead-time cycle. Use actual stock history to check inventory turns.
Frequently asked questions
Why does a one-connector requirement increase create a new card?
Each card authorizes one complete container, so the worksheet rounds a fractional container requirement up.
Could a different connector pack size reduce the fourth-bin jump?
A smaller bin can reduce rounding reserve. Check handling frequency, packaging standards, and stockroom picking capacity.