NFPA 13 · Worked example
Non-dwelling dry system under 500 gallons
A Schedule 10 main and three branch inventories are modeled with 35 psi supervisory pressure and a compressor delivering 7 SCFM.
Inputs
Supervisory pressure fill curve
Edit inputsWithin the selected dry-pipe volume allowance.
How to read this example
Check both the volume allowance without a quick-opening device and the time to restore supervisory pressure.
Open the base calculatorCalculated values
- Total system volume
- 440.19 gal
- Pipe volume subtotal
- 428.19 gal
- Free air added from 0 psig
- 140.14 ft³
- Required free-air delivery
- 5.07 SCFM
- Modeled fill time
- 21.23 min
- Compressor delivery reserve
- 1.93 SCFM
- Selected dry-pipe volume allowance
- 500 gal
- Dry-pipe volume reserve
- 59.81 gal
Pipe volume by run 4 rows
| Run | Internal borein | Lengthft | Volumegal |
|---|---|---|---|
| 1 | 4.26 | 350 | 259.1 |
| 2 | 2.157 | 600 | 113.9 |
| 3 | 1.442 | 650 | 55.1 |
| 4 | 1.097 | 0 | 0 |
Equations and assumptions
V_pipe = Σ π d² L / 4V_free = V_system × P_gauge / P_atmFAD_30 = V_free / 30 + leakage
The non-dwelling dry-pipe volume screening paths are 500 gal without a quick-opening device or 750 gal with one. Larger volumes can use applicable timed delivery or listed calculation paths. Dwelling dry pipe and preaction require their own delivery criteria.
The isothermal fill starts at 0 psig with free air referenced to 14.696 psia. Use delivered compressor airflow at the target pressure and the valve manufacturer’s supervisory setpoint.
The 30-minute curve describes air restoration. Water delivery after sprinkler operation is evaluated separately.