NFPA 14 · Worked example
Partly sprinklered building flow cap
Six risers are modeled for a building that is not fully sprinklered. The remote outlet is 112 ft above the base.
Inputs
Class I riser elevation
Edit inputsThe outlet schedule flags static or modeled residual pressure above 175 psi.
How to read this example
The selected flow cap is 1,250 GPM. The floor pressure schedule separately identifies outlets to review.
Open the base calculatorCalculated values
- Class I demand after cap
- 4,731.76 L/min
- Flow before cap
- 6,624.47 L/min
- Applied flow cap
- 4,731.76 L/min
- Elevation head to top outlet
- 3.34 bar
- Required base residual
- 11.41 bar
- Estimated top static
- 9.07 bar
- Governing base outlet pressure
- 12.41 bar
- Reserve below outlet pressure ceiling
- -0.34 bar
- Floors flagged for pressure review
- 1
- First floor within pressure screen
- 2
Outlet pressure by floor 10 rows
| Floor | Risem | Staticbar | Flowingbar | PRV review |
|---|---|---|---|---|
| 1 | 0 | 12.4 | 11.4 | Static |
| 2 | 3.8 | 12 | 10.9 | Clear |
| 3 | 7.6 | 11.7 | 10.4 | Clear |
| 4 | 11.4 | 11.3 | 9.9 | Clear |
| 5 | 15.2 | 10.9 | 9.4 | Clear |
| 6 | 19 | 10.6 | 8.9 | Clear |
| 7 | 22.8 | 10.2 | 8.4 | Clear |
| 8 | 26.6 | 9.8 | 7.9 | Clear |
| 9 | 30.3 | 9.4 | 7.4 | Clear |
| 10 | 34.1 | 9.1 | 6.9 | Clear |
Equations and assumptions
Q = min(500 + 250 (n − 1), 1000 or 1250 GPM)P_base,flowing = 100 psi + 0.433 Δz + frictionP_static at floor = P_base,static − 0.433 × floor rise
This is the common vertical Class I demand basis. The remote 2½-inch outlet target is 100 psi residual. Special layouts, large floor areas and combined-system criteria can change the flow basis.
The floor schedule assumes evenly spaced outlets and prorates the entered flowing loss by elevation. A floor is flagged if static or modeled residual exceeds 175 psi. Verify listed pressure regulation using the available inlet static and residual, valve ratings and the adopted edition.
Residual and static inputs describe separate conditions. Reconcile a static pressure below the required flowing base or any modeled negative static before selecting a zone.