Use absolute pressure and absolute temperature in the equations. Constant k, average Z, and an entered casing limit give a preliminary estimate. API 617 equipment selection and ASME PTC 10 or ISO 5389 performance verification require the applicable project specification and vendor data. Actual suction flow uses the entered average Z as suction Z.
The API 618 sixth-edition predicted discharge screens are 135 °C generally and 120 °C for hydrogen-rich gas (molecular weight ≤ 12) or non-lubricated cylinders. Selecting hydrogen-rich service also applies the stricter temperature screen. The alternate project basis uses 150/135 °C. A hydrogen-rich vendor shutdown benchmark is 300 °F (about 149 °C). Obtain service limits, cylinder preheat, valve losses, rod reversal, inertial loads, and mechanical losses from the vendor. Total power here is gas compression power.
Gas and vapor only. Use the correct relieving load, accumulation, combination factor and manufacturer capacity data for the actual service. Check certified capacity, built-up and superimposed backpressure, valve lift, inlet pressure loss, and two-phase or near-critical behavior separately.
Steady single-phase dry gas. Treat Weymouth and Panhandle B as empirical alternatives within their applicable flow ranges. The model requires a declining pressure profile and flags a depleted pressure-squared budget. API RP 14E is an offshore production piping practice, so the displayed velocity comparison is only a screen for this dry-gas case. Confirm erosion, corrosion, solids and transient behavior separately.
Use the hydrate correlation for sweet, water-bearing natural gas in the working screen of G = 0.55–1.00 and 0.5–14 MPa. Treat extrapolation with care. CO₂, nitrogen, and hydrogen need composition-specific hydrate checks. Use a real-gas isenthalpic flash and a metal temperature analysis to assess phase change, water activity, inhibition, and material limits.
The selectable 50% target uses initial absolute pressure. API 521 fire depressuring guidance commonly references 50% of vessel design pressure in about 15 minutes in its applicable scenario. About 6.9 barg in 15 minutes is another commonly used consequence-reduction screen. Confirm the design target, flare network backpressure, heat input, vapor–liquid behavior, wall temperature and stress before approval.
Subsonic pipe-flare screening. The point-source approximation is less reliable close to the flame. API 521 Table 12 associates 1.58 kW/m² with continuous exposure, 4.73 kW/m² with brief emergency action, and 9.46 kW/m² with urgent action lasting only seconds. These contexts assume appropriate clothing. A zero extent indicates no modeled ground area above that threshold. Verify tip data, solar load, exposure criteria, weather, noise, and unignited dispersion.
Similarity is a preliminary comparison at homologous operating points. Compressible maps require corrected speed and corrected flow where applicable. Use measured OEM surge and choke points, actual gas properties, valve dynamics, and control design for anti-surge protection.