Equal grades give a straight tangent
Check elevation stationing when both grades are the same.
More examplesSurvey anatomy
Profile & sight-distance check
Computed results
Straight grade
Tangent and curve controls
- PVC
- 0+440.000m
- PVC elevation
- 19.1m
- PVI
- 0+500.000m
- PVI tangent elevation
- 20m
- PVT
- 0+560.000m
- PVT elevation
- 20.9m
- Grade difference A
- 0%
- K rate
- —
- Interior turning point
- None
Stopping sight distance check
- Required sight distance S
- 90m
- Geometric minimum L
- 0m
- Geometric minimum K
- —
- Long-curve K at S
- —
- Sizing branch
- Straight tangent
Profile elevations and grades
| Point | Stationm | Offset from PVCm | Elevationm | Grade% |
|---|---|---|---|---|
| PVC | 0+440.000 | 0 | 19.1 | 1.5 |
| Stake | 0+460.000 | 20 | 19.4 | 1.5 |
| Stake | 0+480.000 | 40 | 19.7 | 1.5 |
| Stake | 0+500.000 | 60 | 20 | 1.5 |
| Stake | 0+520.000 | 80 | 20.3 | 1.5 |
| Stake | 0+540.000 | 100 | 20.6 | 1.5 |
| PVT | 0+560.000 | 120 | 20.9 | 1.5 |
Worked check
The vertical offset term is zero. Each 60 m half changes elevation by 0.9 m. There is no curvature rate for the straight grade.
- PVC elevation (m)
- 19.1
- PVT elevation (m)
- 20.9
- Curvature rate
- Undefined
These checks describe the original example. Reset restores the original inputs.
Formulas and conventions
Build the symmetric profile
A = g₂ − g₁ · z(x) = zPVC + g₁x ÷ 100 + Ax² ÷ (200L)
PVC and PVT are L/2 either side of the tangent intersection PVI. Grades are entered in percent. When grades have opposite signs, x = −g₁L/A is the interior turning point and its slope is exactly zero.
Join unequal tangents
gⱼ = (L₁g₁ + L₂g₂) ÷ L · zⱼ = zPVI + A L₁ L₂ ÷ (200L)
L₁ is PVC to PVI and L₂ is PVI to PVT. Each parabola integrates a linear grade between the endpoint and common join grade. Find the zero grade on the piece where the signs change. The local K values are L₁/|gⱼ − g₁| and L₂/|g₂ − gⱼ|.
Calculate the curvature rate
K = L ÷ |A|
K is length per percentage point of grade change. Equal grades form a straight tangent and have no finite K. Station labels use 100-foot stations or kilometer plus meters, depending on the working unit.
Compare the SSD geometry
Lmin = |A| S² ÷ C when Lmin ≥ S · otherwise max(0, 2S − C ÷ |A|)
For a crest, C = 200(√h₁ + √h₂)², with eye height 3.5 ft and object height 2 ft. For a sag, C = 200(h + S tan 1°), with headlight height 2 ft. The two minimum-length branches apply to equal tangents. Unequal tangents use a sufficient screen: both local K values must meet S²/C. If either is tighter, check the complete sight line. Use the adopted agency criteria and drainage controls.
More worked examples
Open a case to edit its inputs and compare the original checks.
- Symmetric metric crest high point
Solve a symmetric 2% to −2% crest and check the high point at midcurve.
- Symmetric −3% to +3% sag
Find the low point and compare its curvature rate with a required sight distance.
- Rising crest without a high point inside
Distinguish a crest in grade change from a crest with an interior summit.
- Short-curve stopping sight distance
Apply the short-curve branch when the required sight distance exceeds the curve length.
- Asymmetric sag in U.S. survey feet
Locate the low point of a −4% to +2% sag with unequal tangent lengths on an older alignment.
GeoSurveyLab · Field calculation
Equal grades give a straight tangent
Straight grade
Field inputs
- Working unit
- Meters (m)
- Tangent lengths
- Equal tangent lengths
- Entering grade g₁
- 1.5 %
- Exiting grade g₂
- 1.5 %
- PVI station
- 500 m
- PVI elevation
- 20 m
- Curve length
- 120 m
- Stake interval
- 20 m
- Required sight distance
- 90 m
Tangent and curve controls
- PVC
- 0+440.000m
- PVC elevation
- 19.1m
- PVI
- 0+500.000m
- PVI tangent elevation
- 20m
- PVT
- 0+560.000m
- PVT elevation
- 20.9m
- Grade difference A
- 0%
- K rate
- —
- Interior turning point
- None
Stopping sight distance check
- Required sight distance S
- 90m
- Geometric minimum L
- 0m
- Geometric minimum K
- —
- Long-curve K at S
- —
- Sizing branch
- Straight tangent
Profile elevations and grades
| Point | Stationm | Offset from PVCm | Elevationm | Grade% |
|---|---|---|---|---|
| PVC | 0+440.000 | 0 | 19.1 | 1.5 |
| Stake | 0+460.000 | 20 | 19.4 | 1.5 |
| Stake | 0+480.000 | 40 | 19.7 | 1.5 |
| Stake | 0+500.000 | 60 | 20 | 1.5 |
| Stake | 0+520.000 | 80 | 20.3 | 1.5 |
| Stake | 0+540.000 | 100 | 20.6 | 1.5 |
| PVT | 0+560.000 | 120 | 20.9 | 1.5 |
For planning, training, and independent checks. Have a locally licensed Professional Land Surveyor (PLS) verify legal boundaries and survey control. Have a licensed Professional Engineer (PE) verify engineering layout and design where required.