Clay consolidation settlement

Estimate primary clay settlement, stress history and time to a selected degree of consolidation.

Settlement
96.03 mm
OCR
1.4
Time to 50%
65.6 days
Time to 90%
282.7 days
Compression path & time response Schematic
Compression path & time response, schematic Void ratio vs. log σ′Degree vs. timeσ′p 105 kPaTarget 282.7 daysTarget degree90%
  • Compression
  • Time response
  • Target

Loading crosses preconsolidation pressure. Both compression slopes contribute.

Calculation details
Stress pathOC → NC
Final effective stress140 kPa
Final void ratio0.952
Recompression settlement16.07 mm
Virgin compression settlement79.96 mm
Longest drainage path Hdr2 m
Target time factor Tv0.8481
Time to target282.7 days
Settlement at target86.43 mm

Inputs

Clay layer and loading
Compression and drainage

Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.

Method & assumptions

  1. OCR = σ′p / σ′₀. Settlement is H₀/(1 + e₀) times the decrease in void ratio. Use Cr log₁₀(σ′/σ′₀) up to σ′p and Cc log₁₀(σ′/σ′p) beyond it.
  2. For normally consolidated clay, σ′p equals σ′₀ and the full stress increment follows Cc. Overconsolidated clay uses only Cr when final stress stays below or at σ′p.
  3. t = Tv Hdr² / cv. Hdr is H₀ for single drainage or H₀/2 for double drainage. Tv is found from Terzaghi’s average consolidation series and its short-time limit.
  4. Use a representative initial stress and added stress at the layer midpoint. The method assumes one homogeneous saturated layer, one-dimensional strain, sudden loading and constant cv. Compute separate layers when properties vary.

Worked examples