Worked example
Overconsolidated clay below yield
A modest foundation pressure increment leaves final stress below the soil’s prior maximum.
Results
Edit inputs ↓- Settlement
- 15.1 mm
- OCR
- 1.94
- Time to 50%
- 37.9 days
- Time to 90%
- 163.4 days
- Compression
- Time response
- Target
Final stress stays on the recompression branch.
Calculation details
| Stress path | OC |
|---|---|
| Final effective stress | 130 kPa |
| Final void ratio | 0.862 |
| Recompression settlement | 15.1 mm |
| Virgin compression settlement | 0 mm |
| Longest drainage path Hdr | 1.7 m |
| Target time factor Tv | 0.8481 |
| Time to target | 163.4 days |
| Settlement at target | 13.59 mm |
GeotechSoilLab · Screening sheet · Metric SI
Overconsolidated clay below yield
| Layer thickness H₀ | 3.4 m |
|---|---|
| Initial void ratio e₀ | 0.87 |
| Initial stress σ′₀ | 85 kPa |
| Preconsolidation σ′p | 165 kPa |
| Added stress Δσ′ | 45 kPa |
| Compression index Cc | 0.27 |
| Recompression Cr | 0.045 |
| Drainage faces | Double |
| Consolidation rate cv | 0.015 m²/day |
| Target consolidation U | 90 % |
| Settlement | 15.1 mm |
|---|---|
| OCR | 1.94 |
| Time to 50% | 37.9 days |
| Time to 90% | 163.4 days |
| Stress path | OC |
| Final effective stress | 130 kPa |
| Final void ratio | 0.862 |
| Recompression settlement | 15.1 mm |
| Virgin compression settlement | 0 mm |
| Longest drainage path Hdr | 1.7 m |
| Target time factor Tv | 0.8481 |
| Time to target | 163.4 days |
| Settlement at target | 13.59 mm |
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Worked result
Recompression accounts for the settlement because the final 130 kPa stress is below the 165 kPa preconsolidation pressure.
- Add 45 kPa to 85 kPa to get 130 kPa. The preconsolidation stress is 165 kPa.
- Add 15.097 mm of recompression and 0 mm of virgin compression to get 15.097 mm.
- Use Tv = 0.8481 and Hdr = 1.7 m in TvHdr²/cv. This gives 163.4 days to 90% consolidation.
Settlement15.1 mmOCR1.94Time to 50%37.9 daysTime to 90%163.4 days
Original case inputs
| Layer thickness H₀ | 3.4 m |
|---|---|
| Initial void ratio e₀ | 0.87 |
| Initial stress σ′₀ | 85 kPa |
| Preconsolidation σ′p | 165 kPa |
| Added stress Δσ′ | 45 kPa |
| Compression index Cc | 0.27 |
| Recompression Cr | 0.045 |
| Drainage faces | Double |
| Consolidation rate cv | 0.015 m²/day |
| Target consolidation U | 90 % |
Method & assumptions
- OCR = σ′p / σ′₀. Settlement is H₀/(1 + e₀) times the decrease in void ratio. Use Cr log₁₀(σ′/σ′₀) up to σ′p and Cc log₁₀(σ′/σ′p) beyond it.
- For normally consolidated clay, σ′p equals σ′₀ and the full stress increment follows Cc. Overconsolidated clay uses only Cr when final stress stays below or at σ′p.
- t = Tv Hdr² / cv. Hdr is H₀ for single drainage or H₀/2 for double drainage. Tv is found from Terzaghi’s average consolidation series and its short-time limit.
- Use a representative initial stress and added stress at the layer midpoint. The method assumes one homogeneous saturated layer, one-dimensional strain, sudden loading and constant cv. Compute separate layers when properties vary.
More worked examples
- Normally consolidated clay under fillAn embankment loads a normally consolidated clay layer bounded by permeable sand.
- Clay compressed past preconsolidationA heavy fill increment pushes an overconsolidated clay through its yield stress.
- Clay with single-sided drainageA clay layer is drained at its top and underlain by nearly impermeable material.
- Loading that reaches preconsolidation stressA staged load raises the effective stress exactly to the estimated preconsolidation stress.
- Time to 95% consolidationA staging study checks the estimated time to reach 95% primary consolidation for a thick layer.